    Nigeria rooftop solar data

    Rooftop solar in Katsina State: buildings, spend and payback

    3,594,546 buildings in Katsina State carry a viable rooftop. Together they spend ₦1.11tn a year on grid power and generator fuel, and 16% of them run a generator.

    Viable buildings

    3,594,546

    Usable roof area

    138 km²

    30.7 GWp of roof capacity

    Current energy spend

    ₦1.11tn/yr

    1.05 TWh/yr from generators

    Median payback

    6.9 yr

    Median IRR 15% (cash saved)

    The savings bracket for Katsina

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦1.11tn/yr
    Year-one cash saved₦1.01tn
    Lifetime cash saved₦52.2tn
    NPV₦8.11tn
    Median IRR15%
    Median payback6.9 yr
    Unlocked energy747 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity3.6 GWp
    Capex₦3.83tn
    Year-one energy value₦3.8tn
    Lifetime energy value₦178tn
    NPV₦30.6tn
    Median IRR105%
    Median payback1.1 yr

    Three ways to size Katsina State's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    3.6 GWp
    Capital cost
    ₦3.83tn
    Year 1 savings
    ₦3.8tn/yr
    NPV
    ₦30.6tn
    Median IRR
    105%
    Median payback
    1.1 yr

    The odds a rooftop in Katsina State pays back quickly

    Of the 3,555,458 buildings in Katsina State with a modelled payback, 39.6% pay back inside five years and 15.4% inside three.

    Payback under 5 years

    39.6%

    Payback under 3 years

    15.4%

    IRR above 20%

    42.3%

    Under 3 years · 15%3 – 5 years · 24%5 – 7 years · 11%7 – 10 years · 13%Over 10 years · 37%

    Coverage: 99% of buildings in Katsina State produced a payback figure. Buildings with no viable scenario are excluded rather than counted as zero.

    How much of Katsina State's demand actually gets met

    Buildings in Katsina State consume 2.11 TWh/yr but want 2.85 TWh/yr. The 26% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Met today · 74%Suppressed · 26%

    Energy wanted

    2.85 TWh/yr

    Energy consumed

    2.11 TWh/yr

    Unmet demand

    747 GWh/yr

    Modelled latent demand, not metered consumption. It is the load buildings would run given affordable, available supply.

    How many rooftops in Katsina State actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 3,555,458 buildings with a modelled result out of 3,594,546 in Katsina State. 1,785,795 clear a positive NPV.

    Payback

    Under 3 years548,812 (15%)
    Under 5 years1,406,330 (40%)
    Under 7 years1,789,732 (50%)
    Under 10 years2,236,772 (63%)

    Return (IRR)

    Above 10%2,098,538 (58%)
    Above 15%1,785,795 (50%)
    Above 20%1,519,554 (42%)
    Above 25%1,206,249 (34%)

    Electricity billing bands in Katsina State

    Loading band economics…

    What a delivered unit costs, by DisCo

    Grid tariff plus the generator running that fills the gap, blended across every building the DisCo serves. Ranked most expensive first — the higher the all-in rate, the stronger the case for solar.

    Loading the league table…

    Ikeja and Eko are reported together as Lagos. Rates are modelled blends of billed grid energy and generator running, not published tariffs.

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Katsina State.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Where the opportunity sits

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    D968,966125,133₦269bn₦238bn9%13.1 yr
    C883,208135,812₦273bn₦246bn13%8.1 yr
    E838,251102,578₦217bn₦192bn9%9.9 yr
    A478,678111,144₦178bn₦171bn27%4.1 yr
    B425,44382,548₦174bn₦160bn23%4.6 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential3,548,230525,659₦573bn₦558bn15%7.1 yr
    Commercial General15,53610,416₦71.2bn₦69.4bn49%2.1 yr
    Commercial Retail15,0309,810₦3.06bn₦3.06bn47%2.4 yr
    Anchor12,6159,018₦461bn₦374bn63%1.6 yr
    Worship2,6302,052₦2.01bn₦2.01bn63%1.6 yr
    Industrial350174₦420m₦419m43%2.4 yr
    Hospitality7650₦573m₦563m41%2.6 yr
    Filling Station3618₦57m₦57m39%2.4 yr
    Mall Retail3413₦111m₦111m39%2.6 yr
    Productive Use84₦15.1m₦15.1m43%2.4 yr
    Automotive11₦106k₦106k41%2.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m21,793,380210,053₦25.4bn₦25.2bn7%14.9 yr
    30 50m2795,280123,373₦28.5bn₦28.1bn15%7.1 yr
    50 100m2603,294112,919₦70.6bn₦69.4bn29%3.9 yr
    100 250m2292,50273,736₦171bn₦164bn31%3.4 yr
    250 1000m297,49031,037₦286bn₦280bn33%3.4 yr
    Over 1000m212,6006,097₦530bn₦441bn35%3.1 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban1,675,041307,145₦548bn₦497bn11%8.9 yr
    Unclassified707,19427,956₦152bn₦136bn7%14.4 yr
    Urban Centre498,261120,499₦160bn₦157bn27%4.1 yr
    Dense Urban442,17580,116₦154bn₦139bn21%4.9 yr
    Rural271,87521,499₦97bn₦78.8bn11%8.4 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed2,087,761246,453₦31.7bn₦31.7bn7%13.9 yr
    Residential Informal613,260126,900₦110bn₦110bn25%4.1 yr
    Residential Small526,09195,587₦69.6bn₦67.9bn29%3.6 yr
    Residential245,51553,670₦359bn₦346bn31%3.4 yr
    Residential Formal74,9792,857₦1.95bn₦1.94bn19%5.4 yr
    Kiosk Shop15,0239,806₦3.05bn₦3.05bn47%2.4 yr
    Institutional8,3885,976₦440bn₦356bn59%1.9 yr
    Commercial Corridor6,1663,939₦35.9bn₦34.7bn49%2.1 yr
    Commercial3,4682,287₦19bn₦18.5bn45%2.4 yr
    Educational Facility3,3392,456₦5.85bn₦5.85bn89%1.1 yr
    School2,1831,526₦2.96bn₦2.96bn83%1.4 yr
    Healthcare Facility2,0711,489₦15.4bn₦14.3bn59%1.9 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)3,592,470557,066₦1.11tn₦1tn
    Farmland1,8940₦8.81m₦8.81m
    Industrial10675₦2.99bn₦2.99bn
    Farmyard7474₦1.15bn₦1.15bn
    Orchard20₦1.94k₦1.94k

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard3,572,099541,866₦594bn₦579bn15%6.9 yr
    Enterprise12,6739,054₦461bn₦374bn63%1.6 yr
    SME High9,7746,295₦55.5bn₦53.9bn47%2.4 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.01,965,118226,149₦28.9bn₦28.9bn
    2.0569,940108,884₦82.3bn₦80.3bn
    3.0481,713111,379₦614bn₦555bn
    1.0341,80460,554₦23.9bn₦23.5bn
    4.0232,25148,040₦325bn₦285bn
    5.03,0401,721₦22.1bn₦20.7bn
    6.0680488₦15.1bn₦14.9bn

    Not published for this cube: Median IRR, Median payback.

    Local government areas in Katsina