Katsina State
Rooftop solar in Dan Musa, Katsina: what the roofs are worth
Dan Musa has 72,224 buildings with a viable rooftop and 421 MWp of roof capacity. 12% run a generator, and together they spend ₦8.66bn a year on energy.
72,224
1.92 km²
421 MWp roof capacity
₦8.66bn/yr
7.07 GWh/yr burned on generators
9.1 yr
Median IRR 11% (cash saved)
The savings bracket for Dan Musa
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Dan Musa's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 54.2 MWp
- Capital cost
- ₦58.9bn
- Year 1 savings
- ₦67bn/yr
- NPV
- ₦551bn
- Median IRR
- 109%
- Median payback
- 0.9 yr
The odds a rooftop in Dan Musa pays back quickly
Of the 71,598 buildings in Dan Musa with a modelled payback, 34.8% pay back inside five years and 12.9% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Dan Musa's demand actually gets met
Buildings in Dan Musa consume 14.9 GWh/yr but want 23.6 GWh/yr. The 37% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Dan Musa
Loading band economics…
How many rooftops in Dan Musa actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 71,598 buildings with a modelled result out of 72,224 in Dan Musa. 30,214 clear a positive NPV.
Payback
Return (IRR)
16.6 kt/yr
4.04 million litres/yr
8.61 GWh/yr
Demand that is suppressed today
204k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Dan Musa.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Dan Musa
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| C | 27,286 | 2,846 | ₦3.17bn | ₦3.08bn | 13% | 7.1 yr |
| E | 22,041 | 2,902 | ₦2.43bn | ₦2.42bn | 11% | 9.4 yr |
| D | 21,848 | 2,805 | ₦2.16bn | ₦1.98bn | 9% | 13.1 yr |
| B | 1,049 | 281 | ₦896m | ₦896m | 31% | 3.6 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 71,309 | 8,362 | ₦7.14bn | ₦6.85bn | 11% | 9.1 yr |
| Commercial General | 322 | 145 | ₦380m | ₦380m | 39% | 2.9 yr |
| Anchor | 270 | 222 | ₦1.09bn | ₦1.09bn | 71% | 1.4 yr |
| Commercial Retail | 261 | 46 | ₦15.5m | ₦15.5m | 37% | 2.9 yr |
| Worship | 60 | 57 | ₦27.5m | ₦27.5m | 71% | 1.4 yr |
| Industrial | 2 | 2 | ₦3.11m | ₦3.11m | 77% | 1.4 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 40,006 | 3,853 | ₦462m | ₦462m | 7% | 14.9 yr |
| 30 50m2 | 16,673 | 2,264 | ₦736m | ₦736m | 13% | 8.1 yr |
| 50 100m2 | 12,108 | 1,878 | ₦2.3bn | ₦2.21bn | 31% | 3.4 yr |
| 100 250m2 | 3,128 | 716 | ₦2.62bn | ₦2.51bn | 31% | 3.4 yr |
| 250 1000m2 | 301 | 120 | ₦2.19bn | ₦2.1bn | 33% | 3.4 yr |
| Over 1000m2 | 8 | 3 | ₦358m | ₦358m | 31% | 3.4 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Urban | 26,310 | 6,365 | ₦5.37bn | ₦5.25bn | 17% | 6.1 yr |
| Unclassified | 20,626 | 124 | ₦1.34bn | ₦1.17bn | 7% | 15.4 yr |
| Rural | 12,695 | 110 | ₦391m | ₦391m | 9% | 9.6 yr |
| Dense Urban | 12,593 | 2,235 | ₦1.56bn | ₦1.56bn | 21% | 4.9 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 42,304 | 3,518 | ₦394m | ₦394m | 7% | 14.4 yr |
| Residential Small | 18,485 | 3,703 | ₦2.96bn | ₦2.87bn | 31% | 3.6 yr |
| Residential Formal | 6,564 | 253 | ₦182m | ₦182m | 15% | 6.4 yr |
| Residential | 3,948 | 888 | ₦3.6bn | ₦3.41bn | 31% | 3.4 yr |
| Kiosk Shop | 261 | 46 | ₦15.5m | ₦15.5m | 37% | 2.9 yr |
| Institutional | 166 | 143 | ₦436m | ₦436m | 63% | 1.6 yr |
| Commercial Corridor | 164 | 9 | ₦65.6m | ₦65.6m | 37% | 2.9 yr |
| Educational Facility | 107 | 83 | ₦136m | ₦136m | 91% | 1.1 yr |
| School | 77 | 61 | ₦67.2m | ₦67.2m | 91% | 1.1 yr |
| Healthcare Facility | 54 | 50 | ₦640m | ₦637m | 61% | 1.6 yr |
| Clinic | 30 | 26 | ₦78.2m | ₦78.2m | 59% | 1.9 yr |
| Worship Center | 21 | 20 | ₦7.54m | ₦7.54m | 73% | 1.4 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 72,224 | 8,834 | ₦8.66bn | ₦8.37bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 71,777 | 8,590 | ₦7.45bn | ₦7.16bn | 11% | 9.1 yr |
| Enterprise | 272 | 224 | ₦1.1bn | ₦1.09bn | 73% | 1.4 yr |
| SME High | 175 | 20 | ₦112m | ₦112m | 37% | 2.9 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 42,307 | 3,521 | ₦395m | ₦395m |
| 2.0 | 10,783 | 2,309 | ₦2.08bn | ₦1.97bn |
| 3.0 | 8,350 | 1,991 | ₦5.01bn | ₦4.92bn |
| 1.0 | 5,389 | 799 | ₦780m | ₦686m |
| 4.0 | 5,293 | 210 | ₦344m | ₦344m |
| 5.0 | 101 | 4 | ₦46.9m | ₦46.9m |
| 6.0 | 1 | 0 | ₦3.95m | ₦3.95m |
Not published for this cube: Median IRR, Median payback.

