    Katsina State

    Rooftop solar in Dan Musa, Katsina: what the roofs are worth

    Dan Musa has 72,224 buildings with a viable rooftop and 421 MWp of roof capacity. 12% run a generator, and together they spend ₦8.66bn a year on energy.

    Viable buildings

    72,224

    Usable roof area

    1.92 km²

    421 MWp roof capacity

    Energy spend

    ₦8.66bn/yr

    7.07 GWh/yr burned on generators

    Median payback

    9.1 yr

    Median IRR 11% (cash saved)

    The savings bracket for Dan Musa

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦8.66bn/yr
    Year-one cash saved₦8.37bn
    Lifetime cash saved₦450bn
    NPV₦68.5bn
    Median IRR11%
    Median payback9.1 yr
    Unlocked energy8.61 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity54.2 MWp
    Capex₦58.9bn
    Year-one energy value₦67bn
    Lifetime energy value₦3.17tn
    NPV₦551bn
    Median IRR109%
    Median payback0.9 yr

    Three ways to size Dan Musa's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    54.2 MWp
    Capital cost
    ₦58.9bn
    Year 1 savings
    ₦67bn/yr
    NPV
    ₦551bn
    Median IRR
    109%
    Median payback
    0.9 yr

    The odds a rooftop in Dan Musa pays back quickly

    Of the 71,598 buildings in Dan Musa with a modelled payback, 34.8% pay back inside five years and 12.9% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Dan Musa's demand actually gets met

    Buildings in Dan Musa consume 14.9 GWh/yr but want 23.6 GWh/yr. The 37% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Dan Musa

    Loading band economics…

    How many rooftops in Dan Musa actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 71,598 buildings with a modelled result out of 72,224 in Dan Musa. 30,214 clear a positive NPV.

    Payback

    Under 3 years9,214 (13%)
    Under 5 years24,943 (35%)
    Under 7 years30,259 (42%)
    Under 10 years40,928 (57%)

    Return (IRR)

    Above 10%37,238 (52%)
    Above 15%30,214 (42%)
    Above 20%26,533 (37%)
    Above 25%22,413 (31%)
    CO₂ avoided

    16.6 kt/yr

    Fuel avoided

    4.04 million litres/yr

    Energy unlocked

    8.61 GWh/yr

    Demand that is suppressed today

    People served

    204k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Dan Musa.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Dan Musa

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    C27,2862,846₦3.17bn₦3.08bn13%7.1 yr
    E22,0412,902₦2.43bn₦2.42bn11%9.4 yr
    D21,8482,805₦2.16bn₦1.98bn9%13.1 yr
    B1,049281₦896m₦896m31%3.6 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential71,3098,362₦7.14bn₦6.85bn11%9.1 yr
    Commercial General322145₦380m₦380m39%2.9 yr
    Anchor270222₦1.09bn₦1.09bn71%1.4 yr
    Commercial Retail26146₦15.5m₦15.5m37%2.9 yr
    Worship6057₦27.5m₦27.5m71%1.4 yr
    Industrial22₦3.11m₦3.11m77%1.4 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m240,0063,853₦462m₦462m7%14.9 yr
    30 50m216,6732,264₦736m₦736m13%8.1 yr
    50 100m212,1081,878₦2.3bn₦2.21bn31%3.4 yr
    100 250m23,128716₦2.62bn₦2.51bn31%3.4 yr
    250 1000m2301120₦2.19bn₦2.1bn33%3.4 yr
    Over 1000m283₦358m₦358m31%3.4 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban26,3106,365₦5.37bn₦5.25bn17%6.1 yr
    Unclassified20,626124₦1.34bn₦1.17bn7%15.4 yr
    Rural12,695110₦391m₦391m9%9.6 yr
    Dense Urban12,5932,235₦1.56bn₦1.56bn21%4.9 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed42,3043,518₦394m₦394m7%14.4 yr
    Residential Small18,4853,703₦2.96bn₦2.87bn31%3.6 yr
    Residential Formal6,564253₦182m₦182m15%6.4 yr
    Residential3,948888₦3.6bn₦3.41bn31%3.4 yr
    Kiosk Shop26146₦15.5m₦15.5m37%2.9 yr
    Institutional166143₦436m₦436m63%1.6 yr
    Commercial Corridor1649₦65.6m₦65.6m37%2.9 yr
    Educational Facility10783₦136m₦136m91%1.1 yr
    School7761₦67.2m₦67.2m91%1.1 yr
    Healthcare Facility5450₦640m₦637m61%1.6 yr
    Clinic3026₦78.2m₦78.2m59%1.9 yr
    Worship Center2120₦7.54m₦7.54m73%1.4 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)72,2248,834₦8.66bn₦8.37bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard71,7778,590₦7.45bn₦7.16bn11%9.1 yr
    Enterprise272224₦1.1bn₦1.09bn73%1.4 yr
    SME High17520₦112m₦112m37%2.9 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.042,3073,521₦395m₦395m
    2.010,7832,309₦2.08bn₦1.97bn
    3.08,3501,991₦5.01bn₦4.92bn
    1.05,389799₦780m₦686m
    4.05,293210₦344m₦344m
    5.01014₦46.9m₦46.9m
    6.010₦3.95m₦3.95m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Katsina