    Rooftop solar in Kankara, Katsina: what the roofs are worth

    Kankara has 148,625 buildings with a viable rooftop and 1.26 GWp of roof capacity. 20% run a generator, and together they spend ₦65.5bn a year on energy.

    Viable buildings

    148,625

    Usable roof area

    5.67 km²

    1.26 GWp roof capacity

    Energy spend

    ₦65.5bn/yr

    65.5 GWh/yr burned on generators

    Median payback

    6.4 yr

    Median IRR 15% (cash saved)

    The savings bracket for Kankara

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦65.5bn/yr
    Year-one cash saved₦57.4bn
    Lifetime cash saved₦2.87tn
    NPV₦469bn
    Median IRR15%
    Median payback6.4 yr
    Unlocked energy30.4 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity169 MWp
    Capex₦181bn
    Year-one energy value₦201bn
    Lifetime energy value₦9.42tn
    NPV₦1.64tn
    Median IRR113%
    Median payback0.9 yr

    Three ways to size Kankara's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    169 MWp
    Capital cost
    ₦181bn
    Year 1 savings
    ₦201bn/yr
    NPV
    ₦1.64tn
    Median IRR
    113%
    Median payback
    0.9 yr

    The odds a rooftop in Kankara pays back quickly

    Of the 147,499 buildings in Kankara with a modelled payback, 41.6% pay back inside five years and 19.8% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Kankara's demand actually gets met

    Buildings in Kankara consume 97.6 GWh/yr but want 128 GWh/yr. The 24% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Kankara

    Loading band economics…

    How many rooftops in Kankara actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 147,499 buildings with a modelled result out of 148,625 in Kankara. 75,665 clear a positive NPV.

    Payback

    Under 3 years29,196 (20%)
    Under 5 years61,431 (42%)
    Under 7 years75,790 (51%)
    Under 10 years99,323 (67%)

    Return (IRR)

    Above 10%92,173 (62%)
    Above 15%75,665 (51%)
    Above 20%65,775 (44%)
    Above 25%53,621 (36%)
    CO₂ avoided

    96.1 kt/yr

    Fuel avoided

    29.9 million litres/yr

    Energy unlocked

    30.4 GWh/yr

    Demand that is suppressed today

    People served

    457k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Kankara.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Kankara

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    D48,7028,789₦21.8bn₦18.3bn11%9.1 yr
    C42,7228,763₦19.5bn₦17.3bn17%6.1 yr
    E38,8999,703₦20bn₦17.6bn15%6.6 yr
    B18,3022,034₦4.25bn₦4.18bn21%5.1 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential147,69328,463₦41.8bn₦40.2bn15%6.6 yr
    Anchor490404₦22.5bn₦16.1bn69%1.4 yr
    Commercial Retail231229₦63.2m₦63.2m73%1.4 yr
    Commercial General204186₦1.04bn₦1000m67%1.6 yr
    Worship66₦50.6m₦50.6m67%1.6 yr
    Industrial11₦441k₦441k57%1.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m272,57612,382₦1.49bn₦1.47bn7%13.9 yr
    30 50m232,5016,716₦1.59bn₦1.59bn13%7.6 yr
    50 100m226,5495,875₦4.35bn₦4.28bn27%3.9 yr
    100 250m211,4182,705₦9.3bn₦8.96bn31%3.4 yr
    250 1000m24,8621,300₦18.9bn₦18.1bn33%3.4 yr
    Over 1000m2719311₦29.9bn₦23bn33%3.4 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban69,38421,343₦39.1bn₦34.5bn21%5.4 yr
    Unclassified33,7601,425₦11.1bn₦9.96bn9%13.6 yr
    Rural24,0362,062₦7.57bn₦5.97bn13%8.1 yr
    Urban Centre15,9081,378₦3.4bn₦3.39bn21%5.1 yr
    Dense Urban5,5373,081₦4.32bn₦3.6bn47%2.4 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed89,07315,729₦2bn₦2bn9%12.9 yr
    Residential Small26,2016,593₦4.84bn₦4.77bn29%3.9 yr
    Residential Informal20,0823,127₦2.74bn₦2.74bn25%4.4 yr
    Residential12,3373,014₦32.2bn₦30.7bn31%3.4 yr
    Institutional277227₦21.9bn₦15.5bn67%1.6 yr
    Kiosk Shop231229₦63.2m₦63.2m73%1.4 yr
    Educational Facility10192₦235m₦235m97%1.1 yr
    Healthcare Facility9271₦500m₦500m61%1.6 yr
    Commercial Corridor8484₦667m₦628m75%1.4 yr
    Clinic7257₦215m₦209m59%1.9 yr
    School6760₦95.9m₦95.9m95%1.1 yr
    Worship Center22₦1.26m₦1.26m63%1.4 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)148,62529,289₦65.5bn₦57.4bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard148,05028,800₦42.3bn₦40.7bn15%6.6 yr
    Enterprise491405₦22.5bn₦16.1bn69%1.4 yr
    SME High8484₦667m₦628m75%1.4 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.085,46515,639₦1.96bn₦1.96bn
    2.022,5375,034₦4.74bn₦4.61bn
    3.020,2645,229₦50.1bn₦43.4bn
    1.015,9962,708₦1.88bn₦1.78bn
    4.04,355671₦6.53bn₦5.41bn
    5.088₦337m₦298m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Katsina