Katsina State
Rooftop solar in Matazu, Katsina: what the roofs are worth
Matazu has 71,316 buildings with a viable rooftop and 667 MWp of roof capacity. 34% run a generator, and together they spend ₦57bn a year on energy.
71,316
3 km²
667 MWp roof capacity
₦57bn/yr
59.3 GWh/yr burned on generators
5.4 yr
Median IRR 21% (cash saved)
The savings bracket for Matazu
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Matazu's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 109 MWp
- Capital cost
- ₦115bn
- Year 1 savings
- ₦116bn/yr
- NPV
- ₦934bn
- Median IRR
- 113%
- Median payback
- 0.9 yr
The odds a rooftop in Matazu pays back quickly
Of the 71,245 buildings in Matazu with a modelled payback, 48.6% pay back inside five years and 33.6% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Matazu's demand actually gets met
Buildings in Matazu consume 95.4 GWh/yr but want 117 GWh/yr. The 19% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Matazu
Loading band economics…
How many rooftops in Matazu actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 71,245 buildings with a modelled result out of 71,316 in Matazu. 38,681 clear a positive NPV.
Payback
Return (IRR)
79.8 kt/yr
24.2 million litres/yr
22.1 GWh/yr
Demand that is suppressed today
206k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Matazu.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Matazu
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| E | 23,839 | 7,957 | ₦20.3bn | ₦18bn | 17% | 5.9 yr |
| D | 21,568 | 4,820 | ₦12bn | ₦10.4bn | 9% | 9.6 yr |
| C | 18,748 | 7,201 | ₦12.5bn | ₦11.4bn | 25% | 4.4 yr |
| B | 7,161 | 4,161 | ₦12.2bn | ₦10bn | 45% | 2.4 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 70,608 | 23,509 | ₦26.7bn | ₦26.6bn | 19% | 5.4 yr |
| Anchor | 385 | 339 | ₦29.6bn | ₦22.5bn | 71% | 1.4 yr |
| Worship | 223 | 207 | ₦321m | ₦321m | 67% | 1.6 yr |
| Commercial General | 96 | 80 | ₦430m | ₦421m | 61% | 1.6 yr |
| Industrial | 4 | 4 | ₦14.3m | ₦14.2m | 49% | 1.6 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 35,733 | 10,202 | ₦1.13bn | ₦1.12bn | 7% | 13.9 yr |
| 30 50m2 | 16,080 | 5,528 | ₦1.05bn | ₦1.05bn | 15% | 7.1 yr |
| 50 100m2 | 10,925 | 4,326 | ₦2.2bn | ₦2.2bn | 31% | 3.4 yr |
| 100 250m2 | 5,337 | 2,335 | ₦4.87bn | ₦4.82bn | 31% | 3.4 yr |
| 250 1000m2 | 2,758 | 1,392 | ₦13.7bn | ₦13.7bn | 43% | 2.4 yr |
| Over 1000m2 | 483 | 356 | ₦34bn | ₦27bn | 71% | 1.4 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Urban | 48,635 | 20,023 | ₦41.5bn | ₦37bn | 27% | 4.1 yr |
| Unclassified | 12,075 | 540 | ₦3.33bn | ₦2.96bn | 7% | 14.4 yr |
| Dense Urban | 6,273 | 3,440 | ₦11.3bn | ₦9.16bn | 43% | 2.4 yr |
| Rural | 4,333 | 136 | ₦842m | ₦733m | 9% | 13.1 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 45,679 | 12,952 | ₦1.58bn | ₦1.58bn | 9% | 12.9 yr |
| Residential Small | 12,043 | 4,643 | ₦2.45bn | ₦2.44bn | 31% | 3.4 yr |
| Residential Informal | 6,900 | 3,467 | ₦2.64bn | ₦2.64bn | 33% | 3.4 yr |
| Residential | 5,986 | 2,447 | ₦20bn | ₦19.9bn | 33% | 3.4 yr |
| Institutional | 325 | 289 | ₦29.3bn | ₦22.3bn | 65% | 1.6 yr |
| Worship Center | 82 | 75 | ₦28.1m | ₦28.1m | 71% | 1.4 yr |
| Educational Facility | 79 | 68 | ₦192m | ₦192m | 93% | 1.1 yr |
| Place Of Worship | 72 | 68 | ₦59.2m | ₦59.2m | 71% | 1.4 yr |
| Healthcare Facility | 52 | 46 | ₦332m | ₦330m | 59% | 1.9 yr |
| School | 47 | 40 | ₦97.3m | ₦97.3m | 91% | 1.1 yr |
| Clinic | 38 | 31 | ₦227m | ₦203m | 59% | 1.9 yr |
| Commercial | 5 | 5 | ₦45.9m | ₦45.9m | 75% | 1.4 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 71,316 | 24,139 | ₦57bn | ₦49.9bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 70,930 | 23,797 | ₦27.4bn | ₦27.3bn | 21% | 5.4 yr |
| Enterprise | 381 | 337 | ₦29.6bn | ₦22.5bn | 73% | 1.4 yr |
| SME High | 5 | 5 | ₦45.9m | ₦45.9m | 75% | 1.4 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 43,727 | 11,724 | ₦1.46bn | ₦1.46bn |
| 3.0 | 10,432 | 4,583 | ₦35.5bn | ₦31.5bn |
| 2.0 | 8,885 | 3,913 | ₦2.37bn | ₦2.32bn |
| 1.0 | 6,236 | 2,666 | ₦844m | ₦844m |
| 4.0 | 2,035 | 1,252 | ₦16.8bn | ₦13.7bn |
| 5.0 | 1 | 1 | ₦21m | ₦21m |
Not published for this cube: Median IRR, Median payback.