    Rooftop solar in Kankia, Katsina: what the roofs are worth

    Kankia has 114,713 buildings with a viable rooftop and 993 MWp of roof capacity. 20% run a generator, and together they spend ₦51.8bn a year on energy.

    Viable buildings

    114,713

    Usable roof area

    4.46 km²

    993 MWp roof capacity

    Energy spend

    ₦51.8bn/yr

    53.4 GWh/yr burned on generators

    Median payback

    8.4 yr

    Median IRR 11% (cash saved)

    The savings bracket for Kankia

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦51.8bn/yr
    Year-one cash saved₦45.8bn
    Lifetime cash saved₦2.27tn
    NPV₦362bn
    Median IRR11%
    Median payback8.4 yr
    Unlocked energy23.6 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity128 MWp
    Capex₦136bn
    Year-one energy value₦135bn
    Lifetime energy value₦6.31tn
    NPV₦1.08tn
    Median IRR107%
    Median payback0.9 yr

    Three ways to size Kankia's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    128 MWp
    Capital cost
    ₦136bn
    Year 1 savings
    ₦135bn/yr
    NPV
    ₦1.08tn
    Median IRR
    107%
    Median payback
    0.9 yr

    The odds a rooftop in Kankia pays back quickly

    Of the 113,303 buildings in Kankia with a modelled payback, 38.1% pay back inside five years and 19.0% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Kankia's demand actually gets met

    Buildings in Kankia consume 95 GWh/yr but want 119 GWh/yr. The 20% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Kankia

    Loading band economics…

    How many rooftops in Kankia actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 113,303 buildings with a modelled result out of 114,713 in Kankia. 52,506 clear a positive NPV.

    Payback

    Under 3 years21,584 (19%)
    Under 5 years43,130 (38%)
    Under 7 years52,620 (46%)
    Under 10 years67,994 (60%)

    Return (IRR)

    Above 10%62,958 (55%)
    Above 15%52,506 (46%)
    Above 20%45,739 (40%)
    Above 25%38,333 (33%)
    CO₂ avoided

    74.9 kt/yr

    Fuel avoided

    20.6 million litres/yr

    Energy unlocked

    23.6 GWh/yr

    Demand that is suppressed today

    People served

    256k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Kankia.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Kankia

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    D33,5875,300₦12.2bn₦10.5bn9%13.4 yr
    C29,2417,358₦12.6bn₦11.6bn13%8.1 yr
    E24,9373,522₦13bn₦11.1bn9%13.4 yr
    B19,4015,372₦10.9bn₦10bn25%4.4 yr
    A7,547939₦3.09bn₦2.56bn19%5.1 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential113,59321,543₦21.4bn₦21.2bn11%8.4 yr
    Anchor460366₦28.5bn₦22.8bn71%1.4 yr
    Commercial Retail259255₦69.2m₦69.2m63%1.6 yr
    Commercial General233194₦1.7bn₦1.64bn63%1.6 yr
    Worship139111₦116m₦116m63%1.6 yr
    Industrial2922₦25.7m₦25.6m55%1.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m262,90810,127₦1.17bn₦1.16bn7%14.6 yr
    30 50m224,0274,844₦921m₦921m13%8.1 yr
    50 100m214,7963,674₦1.62bn₦1.61bn27%4.1 yr
    100 250m28,0702,243₦4.93bn₦4.81bn31%3.4 yr
    250 1000m24,2501,297₦11.2bn₦11.2bn33%3.4 yr
    Over 1000m2662306₦32bn₦26.1bn35%3.1 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Unclassified44,8222,685₦10.5bn₦9.13bn7%14.4 yr
    Urban35,23711,164₦16.5bn₦15.3bn21%5.4 yr
    Dense Urban20,4876,374₦11.5bn₦10.3bn25%4.1 yr
    Rural14,1672,268₦13.3bn₦11.1bn13%7.9 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed73,01510,441₦1.49bn₦1.49bn9%13.6 yr
    Residential Informal16,9524,589₦3.18bn₦3.18bn23%4.4 yr
    Residential Small14,8504,222₦1.67bn₦1.67bn29%3.9 yr
    Residential8,7762,291₦15bn₦14.8bn31%3.4 yr
    Institutional336261₦27.9bn₦22.2bn63%1.6 yr
    Kiosk Shop259255₦69.2m₦69.2m63%1.6 yr
    Educational Facility9784₦226m₦226m93%1.1 yr
    Commercial Corridor8072₦686m₦666m63%1.6 yr
    School7766₦133m₦133m89%1.1 yr
    Healthcare Facility6246₦750m₦664m61%1.6 yr
    Worship Center5139₦19.8m₦19.8m67%1.6 yr
    Place Of Worship4538₦13.8m₦13.8m67%1.6 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)114,71322,491₦51.8bn₦45.8bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard114,15722,037₦22.2bn₦22bn11%8.4 yr
    Enterprise453360₦28.5bn₦22.8bn71%1.4 yr
    SME High10394₦1.08bn₦1.02bn65%1.6 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.068,5629,860₦1.37bn₦1.37bn
    2.015,4584,447₦1.99bn₦1.98bn
    3.014,4534,233₦30.1bn₦26.6bn
    1.012,3142,861₦725m₦723m
    4.03,9071,074₦16.9bn₦14.5bn
    5.01615₦563m₦522m
    6.031₦116m₦96.1m

    Not published for this cube: Median IRR, Median payback.