PureWatts AI

    Solar energy assistant

    📍 Home

    Hi there! 👋

    I'm your PureWatts AI assistant. Ask me anything about solar energy, system sizing, or how to use the platform.

    Skip to content

    Katsina State

    Rooftop solar in Sandamu, Katsina: what the roofs are worth

    Sandamu has 62,204 buildings with a viable rooftop and 426 MWp of roof capacity. 8% run a generator, and together they spend ₦14.5bn a year on energy.

    Viable buildings

    62,204

    Usable roof area

    1.92 km²

    426 MWp roof capacity

    Energy spend

    ₦14.5bn/yr

    11.5 GWh/yr burned on generators

    Median payback

    9.1 yr

    Median IRR 11% (cash saved)

    The savings bracket for Sandamu

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦14.5bn/yr
    Year-one cash saved₦12.9bn
    Lifetime cash saved₦682bn
    NPV₦105bn
    Median IRR11%
    Median payback9.1 yr
    Unlocked energy11.1 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity67.3 MWp
    Capex₦72.4bn
    Year-one energy value₦82.1bn
    Lifetime energy value₦3.86tn
    NPV₦673bn
    Median IRR105%
    Median payback0.9 yr

    Three ways to size Sandamu's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    67.3 MWp
    Capital cost
    ₦72.4bn
    Year 1 savings
    ₦82.1bn/yr
    NPV
    ₦673bn
    Median IRR
    105%
    Median payback
    0.9 yr

    The odds a rooftop in Sandamu pays back quickly

    Of the 61,729 buildings in Sandamu with a modelled payback, 32.7% pay back inside five years and 7.7% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Sandamu's demand actually gets met

    Buildings in Sandamu consume 25.7 GWh/yr but want 36.7 GWh/yr. The 30% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Sandamu

    Loading band economics…

    How many rooftops in Sandamu actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 61,729 buildings with a modelled result out of 62,204 in Sandamu. 28,401 clear a positive NPV.

    Payback

    Under 3 years4,726 (8%)
    Under 5 years20,194 (33%)
    Under 7 years28,446 (46%)
    Under 10 years33,897 (55%)

    Return (IRR)

    Above 10%31,614 (51%)
    Above 15%28,401 (46%)
    Above 20%22,929 (37%)
    Above 25%15,867 (26%)
    CO₂ avoided

    24.9 kt/yr

    Fuel avoided

    6.14 million litres/yr

    Energy unlocked

    11.1 GWh/yr

    Demand that is suppressed today

    People served

    285k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Sandamu.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Sandamu

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    D19,0761,390₦2.59bn₦2.08bn9%13.4 yr
    E18,5321,178₦2.21bn₦2.16bn9%9.9 yr
    C15,8631,008₦6.03bn₦5.02bn9%13.6 yr
    B8,7331,135₦3.69bn₦3.67bn25%4.4 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential61,7594,363₦12bn₦10.6bn11%9.1 yr
    Anchor201145₦1.1bn₦1.08bn61%1.6 yr
    Commercial General123100₦1.37bn₦1.13bn61%1.6 yr
    Commercial Retail8477₦66.6m₦66.6m59%1.9 yr
    Worship3526₦11.2m₦11.2m65%1.6 yr
    Hospitality10₦94.7k₦94.7k31%3.4 yr
    Industrial10₦79.1k₦79.1k41%2.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m236,7442,118₦320m₦320m7%15.4 yr
    30 50m212,089977₦336m₦336m15%7.1 yr
    50 100m27,324716₦918m₦916m31%3.6 yr
    100 250m24,272607₦5bn₦4.16bn31%3.4 yr
    250 1000m21,654267₦5.72bn₦5.18bn33%3.4 yr
    Over 1000m212126₦2.22bn₦2.02bn33%3.4 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban34,3072,761₦5.32bn₦4.87bn7%14.4 yr
    Dense Urban25,3941,887₦7.93bn₦7.28bn21%5.1 yr
    Unclassified2,50363₦1.27bn₦785m5%16.1 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed43,1992,618₦331m₦331m7%14.4 yr
    Residential Informal7,467490₦1.46bn₦1.46bn29%3.9 yr
    Residential Small6,448726₦996m₦994m31%3.6 yr
    Residential4,645529₦9.19bn₦7.85bn33%3.4 yr
    Institutional8558₦627m₦617m59%1.9 yr
    Kiosk Shop8477₦66.6m₦66.6m59%1.9 yr
    Educational Facility7157₦115m₦115m89%1.1 yr
    Commercial Corridor5251₦1.24bn₦1.01bn61%1.6 yr
    School4336₦72.5m₦72.5m87%1.1 yr
    Healthcare Facility4227₦374m₦368m57%1.9 yr
    Clinic3121₦37.4m₦37.4m57%1.9 yr
    Worship Center1410₦3.43m₦3.43m67%1.6 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)62,2044,711₦14.5bn₦12.9bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard61,9474,515₦12.2bn₦10.8bn11%9.1 yr
    Enterprise202145₦1.1bn₦1.08bn61%1.6 yr
    SME High5551₦1.24bn₦1.01bn61%1.6 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.041,7272,432₦307m₦307m
    2.07,763720₦1.35bn₦1.3bn
    3.06,676884₦9.95bn₦8.65bn
    1.04,596496₦266m₦266m
    4.01,437175₦1.95bn₦1.93bn
    5.043₦379m₦172m
    6.011₦324m₦302m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Katsina