Nigeria rooftop solar data
Rooftop solar in Kaduna State: buildings, spend and payback
3,235,754 buildings in Kaduna State carry a viable rooftop. Together they spend ₦931bn a year on grid power and generator fuel, and 16% of them run a generator.
3,235,754
177 km²
39.6 GWp of roof capacity
₦931bn/yr
777 GWh/yr from generators
4.9 yr
Median IRR 21% (cash saved)
The savings bracket for Kaduna
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Kaduna State's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 4.04 GWp
- Capital cost
- ₦4.14tn
- Year 1 savings
- ₦3.72tn/yr
- NPV
- ₦29.8tn
- Median IRR
- 97%
- Median payback
- 1.1 yr
The odds a rooftop in Kaduna State pays back quickly
Of the 3,170,775 buildings in Kaduna State with a modelled payback, 50.3% pay back inside five years and 16.8% inside three.
Payback under 5 years
50.3%
Payback under 3 years
16.8%
IRR above 20%
52.6%
Coverage: 98% of buildings in Kaduna State produced a payback figure. Buildings with no viable scenario are excluded rather than counted as zero.
How much of Kaduna State's demand actually gets met
Buildings in Kaduna State consume 1.87 TWh/yr but want 2.81 TWh/yr. The 34% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Energy wanted
2.81 TWh/yr
Energy consumed
1.87 TWh/yr
Unmet demand
944 GWh/yr
Modelled latent demand, not metered consumption. It is the load buildings would run given affordable, available supply.
How many rooftops in Kaduna State actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 3,170,775 buildings with a modelled result out of 3,235,754 in Kaduna State. 1,968,081 clear a positive NPV.
Payback
Return (IRR)
Electricity billing bands in Kaduna State
Loading band economics…
What a delivered unit costs, by DisCo
Grid tariff plus the generator running that fills the gap, blended across every building the DisCo serves. Ranked most expensive first — the higher the all-in rate, the stronger the case for solar.
Loading the league table…
Ikeja and Eko are reported together as Lagos. Rates are modelled blends of billed grid energy and generator running, not published tariffs.
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Kaduna State.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Where the opportunity sits
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| D | 870,883 | 115,026 | ₦189bn | ₦187bn | 11% | 8.9 yr |
| E | 762,192 | 106,258 | ₦175bn | ₦173bn | 11% | 8.6 yr |
| B | 606,027 | 126,215 | ₦230bn | ₦228bn | 25% | 4.1 yr |
| C | 566,143 | 102,656 | ₦170bn | ₦168bn | 23% | 4.6 yr |
| A | 430,509 | 70,862 | ₦166bn | ₦163bn | 27% | 4.1 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 3,092,937 | 452,098 | ₦559bn | ₦550bn | 21% | 5.1 yr |
| Commercial Retail | 60,462 | 24,508 | ₦8.07bn | ₦8.07bn | 37% | 2.9 yr |
| Commercial General | 59,759 | 28,720 | ₦167bn | ₦166bn | 39% | 2.9 yr |
| Anchor | 13,844 | 9,492 | ₦182bn | ₦180bn | 63% | 1.6 yr |
| Worship | 7,083 | 5,595 | ₦6.2bn | ₦6.2bn | 63% | 1.6 yr |
| Industrial | 669 | 324 | ₦4.74bn | ₦4.71bn | 41% | 2.6 yr |
| Hospitality | 621 | 175 | ₦3.24bn | ₦3.19bn | 37% | 2.9 yr |
| Mall Retail | 132 | 29 | ₦555m | ₦554m | 37% | 2.9 yr |
| Filling Station | 122 | 38 | ₦157m | ₦157m | 37% | 2.9 yr |
| Productive Use | 93 | 28 | ₦199m | ₦199m | 37% | 2.9 yr |
| Automotive | 32 | 10 | ₦24.8m | ₦24.8m | 33% | 3.4 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 1,191,323 | 139,657 | ₦17.9bn | ₦17.6bn | 7% | 14.6 yr |
| 50 100m2 | 757,952 | 125,351 | ₦98.6bn | ₦97bn | 27% | 3.9 yr |
| 30 50m2 | 613,999 | 87,467 | ₦24.1bn | ₦23.8bn | 15% | 6.9 yr |
| 100 250m2 | 568,326 | 133,590 | ₦306bn | ₦302bn | 31% | 3.6 yr |
| 250 1000m2 | 101,230 | 33,360 | ₦283bn | ₦280bn | 31% | 3.4 yr |
| Over 1000m2 | 2,924 | 1,592 | ₦200bn | ₦199bn | 41% | 2.6 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Urban Centre | 959,343 | 181,514 | ₦317bn | ₦315bn | 27% | 4.1 yr |
| Unclassified | 832,854 | 45,655 | ₦163bn | ₦158bn | 7% | 13.9 yr |
| Urban | 652,872 | 176,115 | ₦271bn | ₦269bn | 25% | 4.4 yr |
| Rural | 447,203 | 56,675 | ₦91bn | ₦89.9bn | 17% | 6.4 yr |
| Dense Urban | 343,482 | 61,058 | ₦88.4bn | ₦88bn | 23% | 4.6 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 1,248,962 | 133,747 | ₦16.6bn | ₦16.6bn | 7% | 13.9 yr |
| Residential Small | 677,379 | 136,274 | ₦106bn | ₦103bn | 29% | 3.9 yr |
| Residential Informal | 543,339 | 67,425 | ₦49.4bn | ₦49bn | 25% | 4.4 yr |
| Residential | 308,920 | 86,366 | ₦374bn | ₦367bn | 31% | 3.6 yr |
| Residential Formal | 289,065 | 24,241 | ₦11.7bn | ₦11.6bn | 21% | 5.1 yr |
| Kiosk Shop | 60,459 | 24,507 | ₦7.98bn | ₦7.98bn | 37% | 2.9 yr |
| Commercial | 33,215 | 15,297 | ₦97.1bn | ₦96.7bn | 39% | 2.9 yr |
| Apartment | 18,102 | 2,779 | ₦1.23bn | ₦1.23bn | 29% | 3.6 yr |
| Commercial Corridor | 16,966 | 7,802 | ₦47.9bn | ₦47.9bn | 39% | 2.9 yr |
| Institutional | 9,175 | 6,835 | ₦154bn | ₦154bn | 59% | 1.9 yr |
| Duplex | 7,170 | 1,266 | ₦479m | ₦478m | 29% | 3.6 yr |
| Educational Facility | 5,440 | 3,932 | ₦8.29bn | ₦8.29bn | 85% | 1.1 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 3,220,790 | 515,474 | ₦869bn | ₦858bn |
| Industrial | 9,210 | 3,982 | ₦56.9bn | ₦56.7bn |
| Farmland | 4,865 | 1,156 | ₦3.71bn | ₦3.59bn |
| Commercial | 492 | 258 | ₦621m | ₦621m |
| Orchard | 222 | 11 | ₦17.9m | ₦17.9m |
| Retail | 141 | 136 | ₦86.3m | ₦86.3m |
| Farmyard | 34 | 0 | ₦2.06m | ₦2.06m |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 3,170,877 | 488,066 | ₦597bn | ₦587bn | 21% | 5.1 yr |
| SME High | 50,898 | 23,332 | ₦148bn | ₦148bn | 39% | 2.9 yr |
| Enterprise | 13,979 | 9,619 | ₦186bn | ₦184bn | 61% | 1.6 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 1,212,169 | 131,297 | ₦16.1bn | ₦16.1bn |
| 3.0 | 715,206 | 182,667 | ₦535bn | ₦529bn |
| 2.0 | 539,426 | 98,460 | ₦91bn | ₦88.3bn |
| 4.0 | 535,917 | 62,146 | ₦166bn | ₦165bn |
| 1.0 | 203,364 | 35,809 | ₦18.2bn | ₦17.8bn |
| 5.0 | 25,457 | 8,756 | ₦53.8bn | ₦53.6bn |
| 6.0 | 4,215 | 1,882 | ₦49.8bn | ₦49.6bn |
Not published for this cube: Median IRR, Median payback.

