    Rooftop solar in Sanga, Kaduna: what the roofs are worth

    Sanga has 78,595 buildings with a viable rooftop and 729 MWp of roof capacity. 11% run a generator, and together they spend ₦15.5bn a year on energy.

    Viable buildings

    78,595

    Usable roof area

    3.28 km²

    729 MWp roof capacity

    Energy spend

    ₦15.5bn/yr

    13.7 GWh/yr burned on generators

    Median payback

    6.1 yr

    Median IRR 15% (cash saved)

    The savings bracket for Sanga

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦15.5bn/yr
    Year-one cash saved₦15bn
    Lifetime cash saved₦807bn
    NPV₦123bn
    Median IRR15%
    Median payback6.1 yr
    Unlocked energy14.9 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity108 MWp
    Capex₦114bn
    Year-one energy value₦117bn
    Lifetime energy value₦5.56tn
    NPV₦955bn
    Median IRR107%
    Median payback0.9 yr

    Three ways to size Sanga's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    108 MWp
    Capital cost
    ₦114bn
    Year 1 savings
    ₦117bn/yr
    NPV
    ₦955bn
    Median IRR
    107%
    Median payback
    0.9 yr

    The odds a rooftop in Sanga pays back quickly

    Of the 76,044 buildings in Sanga with a modelled payback, 45.6% pay back inside five years and 11.7% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Sanga's demand actually gets met

    Buildings in Sanga consume 25.9 GWh/yr but want 40.9 GWh/yr. The 37% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Sanga

    Loading band economics…

    How many rooftops in Sanga actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 76,044 buildings with a modelled result out of 78,595 in Sanga. 39,666 clear a positive NPV.

    Payback

    Under 3 years8,868 (12%)
    Under 5 years34,706 (46%)
    Under 7 years39,673 (52%)
    Under 10 years49,102 (65%)

    Return (IRR)

    Above 10%45,951 (58%)
    Above 15%39,666 (50%)
    Above 20%36,308 (46%)
    Above 25%31,115 (40%)
    CO₂ avoided

    29 kt/yr

    Fuel avoided

    7.29 million litres/yr

    Energy unlocked

    14.9 GWh/yr

    Demand that is suppressed today

    People served

    318k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Sanga.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Sanga

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    D36,7334,386₦7.66bn₦7.32bn17%5.6 yr
    E31,8763,055₦5.92bn₦5.79bn11%8.4 yr
    C9,9861,413₦1.9bn₦1.9bn17%5.6 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential74,3175,364₦11.4bn₦11.2bn11%7.4 yr
    Commercial Retail2,0011,573₦236m₦236m59%1.9 yr
    Commercial General1,5281,253₦1.88bn₦1.88bn61%1.6 yr
    Anchor537456₦1.75bn₦1.54bn79%1.4 yr
    Worship202199₦178m₦178m65%1.6 yr
    Industrial109₦29.2m₦29.2m65%1.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m231,8882,477₦320m₦320m5%15.4 yr
    50 100m220,0582,423₦3.03bn₦3.03bn27%3.9 yr
    30 50m214,9871,706₦565m₦565m11%8.9 yr
    100 250m210,9802,003₦7.45bn₦7.21bn29%3.9 yr
    250 1000m2676242₦3.37bn₦3.37bn29%3.9 yr
    Over 1000m263₦743m₦535m33%1.1 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Unclassified30,2391,411₦4.6bn₦4.48bn9%13.1 yr
    Urban17,6234,939₦6.52bn₦6.21bn27%4.1 yr
    Rural17,4481,355₦2.58bn₦2.56bn21%5.1 yr
    Dense Urban13,2851,149₦1.78bn₦1.78bn19%5.4 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed37,4532,182₦288m₦288m7%14.6 yr
    Residential Small22,3131,988₦3.17bn₦3.17bn27%3.9 yr
    Residential8,6891,117₦7.84bn₦7.6bn29%3.9 yr
    Residential Formal5,76575₦107m₦107m19%5.4 yr
    Kiosk Shop2,0011,573₦236m₦236m59%1.9 yr
    Commercial707644₦675m₦675m61%1.6 yr
    Commercial Corridor509353₦571m₦571m63%1.6 yr
    Institutional356307₦742m₦742m59%1.9 yr
    Educational Facility223196₦359m₦359m85%1.1 yr
    School152137₦155m₦155m85%1.1 yr
    Healthcare Facility8869₦1.04bn₦834m55%1.9 yr
    Worship Center7069₦38.1m₦38.1m67%1.6 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)78,5708,854₦15.5bn₦15bn
    Industrial250₦1.68m₦1.68m

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard76,8377,396₦12.5bn₦12.2bn13%6.4 yr
    SME High1,216997₦1.25bn₦1.25bn61%1.6 yr
    Enterprise542461₦1.77bn₦1.56bn79%1.4 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.037,4802,204₦291m₦291m
    3.015,6252,722₦9.86bn₦9.51bn
    2.014,4231,922₦3.8bn₦3.69bn
    1.05,5121,553₦724m₦724m
    4.05,255185₦591m₦591m
    5.0293261₦191m₦191m
    6.077₦24.3m₦24.3m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Kaduna