Kaduna State
Rooftop solar in Soba, Kaduna: what the roofs are worth
Soba has 176,141 buildings with a viable rooftop and 1.62 GWp of roof capacity. 11% run a generator, and together they spend ₦31bn a year on energy.
176,141
7.29 km²
1.62 GWp roof capacity
₦31bn/yr
27.2 GWh/yr burned on generators
8.6 yr
Median IRR 11% (cash saved)
The savings bracket for Soba
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Soba's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 149 MWp
- Capital cost
- ₦160bn
- Year 1 savings
- ₦176bn/yr
- NPV
- ₦1.46tn
- Median IRR
- 109%
- Median payback
- 0.9 yr
The odds a rooftop in Soba pays back quickly
Of the 167,751 buildings in Soba with a modelled payback, 35.9% pay back inside five years and 11.5% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Soba's demand actually gets met
Buildings in Soba consume 47.3 GWh/yr but want 73 GWh/yr. The 35% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Soba
Loading band economics…
How many rooftops in Soba actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 167,751 buildings with a modelled result out of 176,141 in Soba. 75,005 clear a positive NPV.
Payback
Return (IRR)
57.2 kt/yr
15.9 million litres/yr
25.7 GWh/yr
Demand that is suppressed today
553k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Soba.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Soba
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| D | 77,940 | 8,076 | ₦12.1bn | ₦12bn | 9% | 9.6 yr |
| E | 65,526 | 7,921 | ₦13bn | ₦12.8bn | 9% | 8.9 yr |
| C | 32,675 | 2,683 | ₦5.95bn | ₦5.88bn | 19% | 5.6 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 173,374 | 16,722 | ₦24.8bn | ₦24.5bn | 11% | 8.9 yr |
| Commercial General | 1,112 | 787 | ₦4bn | ₦4bn | 61% | 1.6 yr |
| Commercial Retail | 763 | 371 | ₦167m | ₦167m | 37% | 2.9 yr |
| Anchor | 543 | 477 | ₦1.67bn | ₦1.67bn | 87% | 1.1 yr |
| Worship | 335 | 309 | ₦283m | ₦283m | 67% | 1.6 yr |
| Industrial | 14 | 14 | ₦26.2m | ₦26.2m | 73% | 1.4 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 81,770 | 5,144 | ₦792m | ₦757m | 5% | 16.6 yr |
| 30 50m2 | 35,897 | 3,661 | ₦1.1bn | ₦1.1bn | 11% | 8.9 yr |
| 50 100m2 | 34,918 | 4,627 | ₦3.98bn | ₦3.98bn | 27% | 4.1 yr |
| 100 250m2 | 19,206 | 4,014 | ₦12.7bn | ₦12.5bn | 31% | 3.6 yr |
| 250 1000m2 | 4,318 | 1,223 | ₦11.4bn | ₦11.3bn | 31% | 3.4 yr |
| Over 1000m2 | 32 | 11 | ₦1.08bn | ₦1.08bn | 33% | 3.4 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Unclassified | 68,243 | 1,980 | ₦4.31bn | ₦4.28bn | 5% | 16.4 yr |
| Urban | 46,931 | 12,533 | ₦17.8bn | ₦17.7bn | 21% | 5.1 yr |
| Rural | 46,395 | 3,044 | ₦7.62bn | ₦7.46bn | 13% | 8.1 yr |
| Dense Urban | 14,572 | 1,123 | ₦1.27bn | ₦1.27bn | 21% | 4.9 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 95,397 | 5,709 | ₦825m | ₦825m | 7% | 15.4 yr |
| Residential Small | 43,826 | 5,719 | ₦4.51bn | ₦4.51bn | 25% | 4.1 yr |
| Residential | 20,847 | 4,025 | ₦18.3bn | ₦18bn | 31% | 3.6 yr |
| Residential Informal | 8,902 | 835 | ₦909m | ₦909m | 25% | 4.4 yr |
| Residential Formal | 4,206 | 386 | ₦266m | ₦232m | 23% | 4.6 yr |
| Kiosk Shop | 763 | 371 | ₦167m | ₦167m | 37% | 2.9 yr |
| Commercial Corridor | 408 | 147 | ₦1.2bn | ₦1.2bn | 39% | 2.9 yr |
| Commercial | 404 | 377 | ₦2.34bn | ₦2.34bn | 67% | 1.6 yr |
| Institutional | 396 | 352 | ₦1.26bn | ₦1.26bn | 61% | 1.6 yr |
| Educational Facility | 232 | 199 | ₦268m | ₦268m | 91% | 1.1 yr |
| School | 181 | 160 | ₦142m | ₦142m | 89% | 1.1 yr |
| Apartment | 140 | 38 | ₦20m | ₦20m | 31% | 3.6 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 176,141 | 18,680 | ₦31bn | ₦30.7bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 174,786 | 17,676 | ₦25.8bn | ₦25.5bn | 11% | 8.9 yr |
| SME High | 812 | 524 | ₦3.53bn | ₦3.53bn | 61% | 1.6 yr |
| Enterprise | 543 | 480 | ₦1.69bn | ₦1.69bn | 85% | 1.1 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 95,086 | 5,727 | ₦824m | ₦824m |
| 3.0 | 34,670 | 6,532 | ₦21.5bn | ₦21.3bn |
| 2.0 | 28,806 | 4,226 | ₦4.34bn | ₦4.22bn |
| 1.0 | 10,001 | 1,330 | ₦839m | ₦839m |
| 4.0 | 7,300 | 764 | ₦2.6bn | ₦2.57bn |
| 5.0 | 258 | 91 | ₦794m | ₦794m |
| 6.0 | 20 | 10 | ₦135m | ₦135m |
Not published for this cube: Median IRR, Median payback.