PureWatts AI

    Solar energy assistant

    📍 Home

    Hi there! 👋

    I'm your PureWatts AI assistant. Ask me anything about solar energy, system sizing, or how to use the platform.

    Skip to content

    Ogun State

    Rooftop solar in Yewa North, Ogun: what the roofs are worth

    Yewa North has 103,642 buildings with a viable rooftop and 1.76 GWp of roof capacity. 45% run a generator, and together they spend ₦45.6bn a year on energy.

    Viable buildings

    103,642

    Usable roof area

    7.88 km²

    1.76 GWp roof capacity

    Energy spend

    ₦45.6bn/yr

    39.8 GWh/yr burned on generators

    Median payback

    4.4 yr

    Median IRR 25% (cash saved)

    The savings bracket for Yewa North

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦45.6bn/yr
    Year-one cash saved₦45bn
    Lifetime cash saved₦2.34tn
    NPV₦358bn
    Median IRR25%
    Median payback4.4 yr
    Unlocked energy33.8 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity155 MWp
    Capex₦161bn
    Year-one energy value₦132bn
    Lifetime energy value₦6.27tn
    NPV₦1.04tn
    Median IRR89%
    Median payback1.1 yr

    Three ways to size Yewa North's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    155 MWp
    Capital cost
    ₦161bn
    Year 1 savings
    ₦132bn/yr
    NPV
    ₦1.04tn
    Median IRR
    89%
    Median payback
    1.1 yr

    The odds a rooftop in Yewa North pays back quickly

    Of the 102,748 buildings in Yewa North with a modelled payback, 63.5% pay back inside five years and 40.3% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Yewa North's demand actually gets met

    Buildings in Yewa North consume 64.7 GWh/yr but want 98.5 GWh/yr. The 34% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Yewa North

    Loading band economics…

    How many rooftops in Yewa North actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 102,748 buildings with a modelled result out of 103,642 in Yewa North. 74,451 clear a positive NPV.

    Payback

    Under 3 years41,430 (40%)
    Under 5 years65,198 (63%)
    Under 7 years74,344 (72%)
    Under 10 years81,202 (79%)

    Return (IRR)

    Above 10%79,938 (77%)
    Above 15%74,451 (72%)
    Above 20%67,654 (65%)
    Above 25%50,173 (48%)
    CO₂ avoided

    82.1 kt/yr

    Fuel avoided

    24.3 million litres/yr

    Energy unlocked

    33.8 GWh/yr

    Demand that is suppressed today

    People served

    351k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Yewa North.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Yewa North

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    E53,83722,886₦25.5bn₦25.2bn25%4.4 yr
    D45,85921,718₦16.9bn₦16.8bn25%4.4 yr
    C2,2871,238₦814m₦813m29%3.6 yr
    A96461₦676m₦658m19%5.9 yr
    B695319₦1.67bn₦1.53bn25%4.4 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential101,77944,817₦37.9bn₦37.5bn25%4.4 yr
    Commercial General737506₦2.14bn₦2.13bn49%2.1 yr
    Anchor466409₦4.76bn₦4.6bn55%1.9 yr
    Industrial287203₦517m₦514m61%1.6 yr
    Worship278225₦182m₦182m55%1.9 yr
    Filling Station4735₦54.6m₦54.4m51%2.1 yr
    Commercial Retail4223₦4.47m₦4.47m47%2.4 yr
    Hospitality53₦7.56m₦7.56m41%2.6 yr
    Productive Use11₦246k₦246k65%1.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    100 250m233,81719,262₦23.4bn₦23.2bn41%2.6 yr
    Under 30m226,4478,780₦758m₦752m9%12.9 yr
    50 100m222,5669,270₦3.38bn₦3.36bn25%4.4 yr
    30 50m216,5355,985₦1.11bn₦947m17%6.4 yr
    250 1000m24,2162,884₦13.4bn₦13.3bn53%2.1 yr
    Over 1000m26141₦3.54bn₦3.48bn55%1.9 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Unclassified46,98515,048₦20.5bn₦20.1bn21%4.9 yr
    Dense Urban28,15215,807₦9.98bn₦9.9bn29%3.9 yr
    Urban18,96810,237₦10.2bn₦10.1bn41%2.6 yr
    Rural9,5375,130₦4.88bn₦4.88bn63%1.6 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed30,4728,676₦853m₦853m7%14.1 yr
    Residential Small25,78010,971₦4.62bn₦4.46bn25%4.4 yr
    Residential21,41712,345₦27.5bn₦27.3bn59%1.9 yr
    Residential Formal19,95610,700₦3.93bn₦3.93bn25%4.4 yr
    Apartment2,6121,421₦648m₦648m29%3.6 yr
    Duplex1,228682₦281m₦281m27%3.9 yr
    Institutional616481₦4.15bn₦4.09bn51%2.1 yr
    Industrial Site266185₦472m₦469m61%1.6 yr
    Residential Informal2440₦14.4m₦14.4m25%4.4 yr
    Educational Facility151136₦507m₦507m75%1.4 yr
    Commercial115110₦427m₦427m49%2.1 yr
    Worship Center10887₦45.8m₦45.8m57%1.9 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)103,34446,161₦44.9bn₦44.3bn
    Industrial29861₦662m₦644m

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard102,68945,463₦39.8bn₦39.4bn25%4.4 yr
    Enterprise745605₦5.16bn₦5bn59%1.9 yr
    SME High208154₦622m₦622m49%2.1 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    3.030,92218,115₦32.6bn₦32.4bn
    0.030,2328,616₦841m₦841m
    4.021,73111,697₦6.73bn₦6.65bn
    2.015,8076,491₦4.63bn₦4.4bn
    1.04,9131,271₦518m₦516m
    5.03631₦198m₦198m
    6.011₦8.51m₦8.51m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Ogun