Rooftop solar in Ado Odo/Ota, Ogun: what the roofs are worth
Ado Odo/Ota has 795,701 buildings with a viable rooftop and 15.2 GWp of roof capacity. 34% run a generator, and together they spend ₦231bn a year on energy.
795,701
67.7 km²
15.2 GWp roof capacity
₦231bn/yr
140 GWh/yr burned on generators
4.4 yr
Median IRR 25% (cash saved)
The savings bracket for Ado Odo/Ota
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Ado Odo/Ota's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 1.34 GWp
- Capital cost
- ₦1.25tn
- Year 1 savings
- ₦666bn/yr
- NPV
- ₦4.73tn
- Median IRR
- 57%
- Median payback
- 1.9 yr
The odds a rooftop in Ado Odo/Ota pays back quickly
Of the 782,801 buildings in Ado Odo/Ota with a modelled payback, 62.4% pay back inside five years and 24.0% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Ado Odo/Ota's demand actually gets met
Buildings in Ado Odo/Ota consume 650 GWh/yr but want 996 GWh/yr. The 35% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Ado Odo/Ota
Loading band economics…
How many rooftops in Ado Odo/Ota actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 782,801 buildings with a modelled result out of 795,701 in Ado Odo/Ota. 644,772 clear a positive NPV.
Payback
Return (IRR)
526 kt/yr
67.9 million litres/yr
346 GWh/yr
Demand that is suppressed today
1.11m
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Ado Odo/Ota.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Ado Odo/Ota
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| A | 341,855 | 64,748 | ₦125bn | ₦122bn | 23% | 4.6 yr |
| B | 213,599 | 102,447 | ₦39.6bn | ₦39.2bn | 25% | 4.4 yr |
| C | 152,481 | 73,887 | ₦37bn | ₦36.1bn | 25% | 4.4 yr |
| D | 63,254 | 24,527 | ₦20.2bn | ₦19.5bn | 23% | 4.6 yr |
| E | 24,512 | 7,506 | ₦8.47bn | ₦7.73bn | 17% | 5.9 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 777,842 | 267,123 | ₦110bn | ₦109bn | 25% | 4.6 yr |
| Commercial General | 6,909 | 2,339 | ₦17.7bn | ₦17.5bn | 33% | 3.1 yr |
| Commercial Retail | 5,170 | 1,381 | ₦653m | ₦653m | 33% | 3.4 yr |
| Anchor | 2,967 | 1,136 | ₦89.1bn | ₦84.6bn | 39% | 2.6 yr |
| Industrial | 2,068 | 950 | ₦10.5bn | ₦10.3bn | 37% | 2.9 yr |
| Worship | 306 | 82 | ₦129m | ₦129m | 33% | 3.4 yr |
| Filling Station | 203 | 53 | ₦118m | ₦118m | 33% | 3.4 yr |
| Hospitality | 189 | 43 | ₦2.35bn | ₦2.31bn | 33% | 3.4 yr |
| Mall Retail | 30 | 7 | ₦62.8m | ₦62.8m | 33% | 3.1 yr |
| Productive Use | 11 | 1 | ₦3.33m | ₦3.33m | 33% | 3.4 yr |
| Automotive | 6 | 0 | ₦1.45m | ₦1.45m | 29% | 3.6 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| 100 250m2 | 264,146 | 98,640 | ₦64.8bn | ₦63.7bn | 25% | 4.4 yr |
| Under 30m2 | 218,210 | 67,751 | ₦4.82bn | ₦4.79bn | 17% | 6.4 yr |
| 50 100m2 | 151,692 | 52,033 | ₦10.3bn | ₦10.3bn | 23% | 4.6 yr |
| 30 50m2 | 110,907 | 36,791 | ₦4.34bn | ₦4.33bn | 21% | 5.4 yr |
| 250 1000m2 | 49,150 | 17,331 | ₦42.5bn | ₦42.4bn | 25% | 4.4 yr |
| Over 1000m2 | 1,596 | 569 | ₦104bn | ₦99bn | 31% | 3.4 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Urban Centre | 727,824 | 253,561 | ₦211bn | ₦205bn | 25% | 4.4 yr |
| Urban | 55,772 | 15,804 | ₦14.6bn | ₦14.5bn | 19% | 5.6 yr |
| Unclassified | 9,299 | 2,602 | ₦4.45bn | ₦4.12bn | 17% | 6.1 yr |
| Dense Urban | 2,806 | 1,148 | ₦802m | ₦801m | 25% | 4.4 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential Formal | 276,798 | 100,011 | ₦29.3bn | ₦29.3bn | 25% | 4.4 yr |
| Residential Informal | 139,070 | 28,428 | ₦16.1bn | ₦16bn | 25% | 4.6 yr |
| Shed | 128,443 | 42,461 | ₦4.27bn | ₦4.27bn | 19% | 5.6 yr |
| Residential Small | 104,659 | 41,518 | ₦8.66bn | ₦8.65bn | 23% | 4.9 yr |
| Residential | 83,677 | 37,347 | ₦46.3bn | ₦45.2bn | 25% | 4.4 yr |
| Apartment | 29,175 | 11,337 | ₦3.62bn | ₦3.62bn | 25% | 4.4 yr |
| Duplex | 15,839 | 5,954 | ₦1.79bn | ₦1.79bn | 25% | 4.4 yr |
| Kiosk Shop | 5,168 | 1,378 | ₦643m | ₦643m | 33% | 3.4 yr |
| Commercial | 3,067 | 1,290 | ₦7.69bn | ₦7.61bn | 35% | 3.1 yr |
| Institutional | 2,487 | 1,028 | ₦87.4bn | ₦83bn | 31% | 3.4 yr |
| Commercial Corridor | 1,734 | 308 | ₦4.46bn | ₦4.45bn | 35% | 3.1 yr |
| School | 941 | 398 | ₦772m | ₦772m | 41% | 2.6 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 783,092 | 271,130 | ₦194bn | ₦188bn |
| Industrial | 10,211 | 1,710 | ₦36.4bn | ₦35.8bn |
| Farmland | 1,965 | 267 | ₦565m | ₦565m |
| Retail | 328 | 5 | ₦6.15m | ₦6.15m |
| Commercial | 104 | 3 | ₦4.52m | ₦4.52m |
| Farmyard | 1 | 0 | ₦51k | ₦51k |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 785,768 | 269,418 | ₦119bn | ₦117bn | 25% | 4.6 yr |
| SME High | 5,147 | 1,693 | ₦12.7bn | ₦12.5bn | 35% | 3.1 yr |
| Enterprise | 4,786 | 2,004 | ₦99.2bn | ₦94.6bn | 39% | 2.6 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 4.0 | 331,702 | 112,664 | ₦121bn | ₦119bn |
| 3.0 | 224,896 | 87,373 | ₦81.2bn | ₦77.7bn |
| 0.0 | 123,557 | 42,094 | ₦4.2bn | ₦4.2bn |
| 2.0 | 91,823 | 25,891 | ₦5.42bn | ₦5.35bn |
| 1.0 | 20,271 | 4,089 | ₦589m | ₦589m |
| 5.0 | 2,910 | 860 | ₦5.95bn | ₦5.91bn |
| 6.0 | 542 | 144 | ₦12.1bn | ₦12bn |
Not published for this cube: Median IRR, Median payback.