PureWatts AI

    Solar energy assistant

    📍 Home

    Hi there! 👋

    I'm your PureWatts AI assistant. Ask me anything about solar energy, system sizing, or how to use the platform.

    Skip to content

    Niger State

    Rooftop solar in Bosso, Niger: what the roofs are worth

    Bosso has 129,062 buildings with a viable rooftop and 1.49m kWp of roof capacity. 68% run a generator, and together they spend ₦28bn a year on energy.

    Viable buildings

    129,062

    Usable roof area

    6.68m m²

    1.49m kWp roof capacity

    Energy spend

    ₦28bn/yr

    26.6m kWh/yr burned on generators

    Median payback

    2.4 yr

    Median IRR 45% (cash saved)

    The savings bracket for Bosso

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦28bn/yr
    Year-one cash saved₦27.5bn
    Lifetime cash saved₦1.17tn
    NPV₦181bn
    Median IRR45%
    Median payback2.4 yr
    Unlocked energy27.2m kWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity165k kWp
    Capex₦158bn
    Year-one energy value₦150bn
    Lifetime energy value₦7.02tn
    NPV₦1.2tn
    Median IRR103%
    Median payback1.1 yr

    Three ways to size Bosso's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    165k kWp
    Capital cost
    ₦158bn
    Year 1 savings
    ₦150bn/yr
    NPV
    ₦1.2tn
    Median IRR
    103%
    Median payback
    1.1 yr

    How many rooftops in Bosso actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. 129,062 of 129,062 clear a positive NPV.

    Payback

    Under 3 years74,651 (58%)
    Under 5 years87,203 (68%)
    Under 7 years129,062 (100%)
    Under 10 years129,062 (100%)

    Return (IRR)

    Above 10%129,062 (100%)
    Above 15%129,062 (100%)
    Above 20%87,986 (68%)
    Above 25%85,866 (67%)
    CO₂ avoided

    52m kg/yr

    Fuel avoided

    13.3m L/yr

    Energy unlocked

    27.2m kWh/yr

    Demand that is suppressed today

    People served

    218k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Bosso.

    Solar panels

    250

    ₦/W

    Inverters

    127,419

    ₦/kVA

    Batteries

    177,500

    ₦/kWh

    Building mix in Bosso

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential127,02586,303₦17.7bn₦17.7bn45%2.4 yr
    Commercial General707419₦2.14bn₦2.14bn35%3.1 yr
    Anchor555375₦6.59bn₦6.02bn45%2.4 yr
    Commercial Retail344236₦60.5m₦60.5m51%2.1 yr
    Worship341191₦137m₦137m39%2.6 yr
    Industrial6948₦1.25bn₦1.25bn43%2.4 yr
    Hospitality158₦161m₦161m47%2.4 yr
    Filling Station53₦4.5m₦4.5m39%2.6 yr
    Mall Retail11₦1.55m₦1.55m29%3.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m252,98040,748₦895m₦895m47%2.4 yr
    50 100m228,93117,953₦4.55bn₦4.55bn43%2.4 yr
    100 250m221,91910,778₦6.59bn₦6.59bn19%5.6 yr
    30 50m221,79716,011₦1.43bn₦1.42bn57%1.9 yr
    250 1000m23,2951,990₦6.52bn₦6.52bn37%2.9 yr
    Over 1000m2140104₦8.05bn₦7.48bn53%1.9 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Unclassified51,39348,483₦8.45bn₦8.42bn59%1.9 yr
    Urban Centre37,1899,789₦5.78bn₦5.78bn19%5.9 yr
    Urban22,50515,816₦9.3bn₦8.94bn41%2.6 yr
    Rural10,34010,141₦3.78bn₦3.58bn67%1.6 yr
    Dense Urban7,6353,355₦730m₦730m19%5.9 yr

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard128,15287,016₦18.8bn₦18.8bn45%2.4 yr
    Enterprise588399₦7.77bn₦7.2bn45%2.4 yr
    SME High322169₦1.49bn₦1.49bn31%3.6 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    0.054,57648,832₦1.13bn₦1.13bn
    2.024,95116,463₦4.79bn₦4.78bn
    4.017,480410₦1.24bn₦1.24bn
    1.016,36514,452₦3.56bn₦3.55bn
    3.015,6217,407₦15.1bn₦14.5bn
    5.06317₦1.25bn₦1.25bn
    6.063₦966m₦966m

    Nearby LGAs in Niger

    How these numbers are produced

    Approach A — energy value (upper bracket)

    Sizes the system to the building's full latent demand and values that energy at the mixed grid/generator tariff. It answers what the energy is worth — not what anyone currently pays.

    Approach B — cash saved (lower bracket)

    Sizes the system to demand that is actually served today, values it by merit order (solar displaces generator kWh first) and caps it at current spend. It answers what a building stops paying.

    Cohort: Viable rooftops (≥0.6 kWp potential).

    • Demand is modelled latent demand, not metered consumption.
    • Fuel is priced at ₦1,800/litre (operator-set). NBS reported ₦3,277/litre for May 2026 — on that basis every naira figure here is roughly 1.8× understated.
    • Generator ownership is a model output, not a survey result: it follows from the grid-availability scale and the 25% demand-suppression assumption.
    • Approach A prices energy nobody currently buys. Its savings must never be read as cash saved.
    • Demand is MODELLED LATENT demand, not metered consumption.
    • Generator ownership is model output, not survey.
    • Medians do not combine across groups — re-derive from the histograms.
    • Per-building files are float32 with 4 significant figures; cast to float64 before summing, because polars keeps Float32 sums in Float32.
    • Null scenario fields mean the roof cannot host 0.6 kWp, not zero savings.
    • `genset` was previously named `diesel` and now uses the segment's real fuel.
    • Ordering holds by construction: grid savings < mixed < genset.