    Rooftop solar in Agaie, Niger: what the roofs are worth

    Agaie has 53,916 buildings with a viable rooftop and 573 MWp of roof capacity. 12% run a generator, and together they spend ₦18.3bn a year on energy.

    Viable buildings

    53,916

    Usable roof area

    2.58 km²

    573 MWp roof capacity

    Energy spend

    ₦18.3bn/yr

    16.1 GWh/yr burned on generators

    Median payback

    6.1 yr

    Median IRR 17% (cash saved)

    The savings bracket for Agaie

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦18.3bn/yr
    Year-one cash saved₦18.1bn
    Lifetime cash saved₦954bn
    NPV₦146bn
    Median IRR17%
    Median payback6.1 yr
    Unlocked energy13.7 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity79.1 MWp
    Capex₦82.7bn
    Year-one energy value₦78bn
    Lifetime energy value₦3.7tn
    NPV₦629bn
    Median IRR103%
    Median payback1.1 yr

    Three ways to size Agaie's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    79.1 MWp
    Capital cost
    ₦82.7bn
    Year 1 savings
    ₦78bn/yr
    NPV
    ₦629bn
    Median IRR
    103%
    Median payback
    1.1 yr

    The odds a rooftop in Agaie pays back quickly

    Of the 52,463 buildings in Agaie with a modelled payback, 42.8% pay back inside five years and 12.8% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Agaie's demand actually gets met

    Buildings in Agaie consume 29.2 GWh/yr but want 42.8 GWh/yr. The 32% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Agaie

    Loading band economics…

    How many rooftops in Agaie actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 52,463 buildings with a modelled result out of 53,916 in Agaie. 28,002 clear a positive NPV.

    Payback

    Under 3 years6,728 (13%)
    Under 5 years22,428 (43%)
    Under 7 years27,997 (53%)
    Under 10 years35,658 (68%)

    Return (IRR)

    Above 10%33,091 (61%)
    Above 15%28,002 (52%)
    Above 20%24,123 (45%)
    Above 25%19,306 (36%)
    CO₂ avoided

    33.1 kt/yr

    Fuel avoided

    9.13 million litres/yr

    Energy unlocked

    13.7 GWh/yr

    Demand that is suppressed today

    People served

    216k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Agaie.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Agaie

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    E24,0462,223₦6.15bn₦6.07bn13%7.4 yr
    D16,0391,128₦4.41bn₦4.4bn17%6.1 yr
    C13,8313,371₦7.77bn₦7.64bn17%5.1 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential52,4925,472₦14.1bn₦13.9bn15%6.4 yr
    Commercial General618542₦2.6bn₦2.6bn59%1.9 yr
    Anchor389331₦1.53bn₦1.51bn75%1.4 yr
    Commercial Retail312280₦90.7m₦90.7m59%1.9 yr
    Worship10496₦40.9m₦40.9m59%1.9 yr
    Filling Station11₦2.64m₦2.64m59%1.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m216,3871,336₦266m₦265m7%15.1 yr
    50 100m214,7791,721₦2.42bn₦2.41bn27%4.1 yr
    30 50m213,8721,010₦506m₦506m11%9.1 yr
    100 250m27,9972,234₦8.68bn₦8.49bn27%3.9 yr
    250 1000m2872416₦5.65bn₦5.62bn29%3.9 yr
    Over 1000m295₦808m₦808m63%1.6 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Rural19,2431,930₦4.72bn₦4.67bn17%6.4 yr
    Unclassified19,0481,297₦5.28bn₦5.12bn11%9.1 yr
    Urban Centre12,1102,693₦6.07bn₦6.06bn15%5.9 yr
    Urban3,321688₦2.2bn₦2.2bn27%4.1 yr
    Dense Urban194114₦54.6m₦54.6m41%2.6 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed19,9531,154₦184m₦184m7%13.9 yr
    Residential Small18,6392,369₦3.35bn₦3.22bn27%4.1 yr
    Residential Formal5,491235₦232m₦232m11%7.9 yr
    Residential5,1811,686₦10.3bn₦10.2bn27%3.9 yr
    Residential Informal3,0660₦18.8m₦18.8m7%12.9 yr
    Commercial Corridor344307₦1.73bn₦1.73bn61%1.6 yr
    Kiosk Shop312280₦90.7m₦90.7m59%1.9 yr
    Institutional225192₦999m₦999m57%1.9 yr
    Educational Facility168150₦272m₦272m83%1.4 yr
    Apartment10120₦9.64m₦9.64m23%4.9 yr
    School9982₦128m₦128m79%1.4 yr
    Commercial7370₦517m₦517m49%2.1 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)53,8126,711₦17.5bn₦17.3bn
    Farmyard480₦2.67m₦2.67m
    Industrial311₦201m₦201m
    Farmland130₦3.8m₦3.8m
    Commercial1210₦626m₦626m

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard53,1106,013₦14.6bn₦14.4bn15%6.4 yr
    SME High417378₦2.25bn₦2.25bn61%1.6 yr
    Enterprise389331₦1.53bn₦1.51bn75%1.4 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.019,6241,160₦183m₦183m
    2.012,8551,627₦3.08bn₦3.04bn
    3.010,7282,547₦12.1bn₦11.9bn
    4.06,236739₦1.89bn₦1.89bn
    1.04,410616₦546m₦546m
    5.05631₦504m₦504m
    6.072₦48.5m₦48.5m

    Not published for this cube: Median IRR, Median payback.