Kebbi State
Rooftop solar in Wasagu-Danko, Kebbi: what the roofs are worth
Wasagu-Danko has 187,893 buildings with a viable rooftop and 1.25 GWp of roof capacity. 12% run a generator, and together they spend ₦20.2bn a year on energy.
187,893
5.66 km²
1.25 GWp roof capacity
₦20.2bn/yr
16.6 GWh/yr burned on generators
13.6 yr
Median IRR 9% (cash saved)
The savings bracket for Wasagu-Danko
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Wasagu-Danko's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 131 MWp
- Capital cost
- ₦142bn
- Year 1 savings
- ₦151bn/yr
- NPV
- ₦1.24tn
- Median IRR
- 103%
- Median payback
- 1.1 yr
The odds a rooftop in Wasagu-Danko pays back quickly
Of the 185,302 buildings in Wasagu-Danko with a modelled payback, 32.0% pay back inside five years and 11.3% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Wasagu-Danko's demand actually gets met
Buildings in Wasagu-Danko consume 35.2 GWh/yr but want 56.6 GWh/yr. The 38% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Wasagu-Danko
Loading band economics…
How many rooftops in Wasagu-Danko actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 185,302 buildings with a modelled result out of 187,893 in Wasagu-Danko. 71,262 clear a positive NPV.
Payback
Return (IRR)
39.8 kt/yr
9.6 million litres/yr
21.4 GWh/yr
Demand that is suppressed today
566k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Wasagu-Danko.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Wasagu-Danko
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| D | 84,041 | 7,581 | ₦5.32bn | ₦5.28bn | 7% | 14.9 yr |
| E | 72,246 | 5,558 | ₦5.77bn | ₦5.63bn | 7% | 14.4 yr |
| C | 31,606 | 8,523 | ₦9.09bn | ₦9bn | 25% | 4.4 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 185,018 | 19,329 | ₦16.2bn | ₦16bn | 7% | 13.9 yr |
| Commercial Retail | 1,153 | 1,033 | ₦171m | ₦171m | 63% | 1.6 yr |
| Commercial General | 909 | 707 | ₦1.59bn | ₦1.59bn | 59% | 1.9 yr |
| Anchor | 425 | 328 | ₦2.09bn | ₦2.05bn | 61% | 1.6 yr |
| Worship | 378 | 260 | ₦96.2m | ₦96.2m | 59% | 1.9 yr |
| Industrial | 9 | 5 | ₦13.3m | ₦13.3m | 73% | 1.4 yr |
| Hospitality | 1 | 0 | ₦163k | ₦163k | 37% | 2.9 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 99,403 | 7,391 | ₦727m | ₦727m | 5% | 17.1 yr |
| 30 50m2 | 40,742 | 4,394 | ₦1.14bn | ₦1.14bn | 9% | 9.4 yr |
| 50 100m2 | 35,672 | 5,768 | ₦4.06bn | ₦3.99bn | 29% | 3.6 yr |
| 100 250m2 | 10,347 | 3,310 | ₦7.07bn | ₦6.91bn | 31% | 3.6 yr |
| 250 1000m2 | 1,700 | 783 | ₦5.63bn | ₦5.61bn | 31% | 3.4 yr |
| Over 1000m2 | 29 | 16 | ₦1.56bn | ₦1.52bn | 65% | 1.6 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Unclassified | 74,999 | 1,745 | ₦3.61bn | ₦3.39bn | 5% | 16.9 yr |
| Rural | 50,488 | 5,507 | ₦2.81bn | ₦2.81bn | 9% | 13.6 yr |
| Dense Urban | 36,120 | 9,754 | ₦9.6bn | ₦9.53bn | 23% | 4.6 yr |
| Urban | 26,286 | 4,656 | ₦4.17bn | ₦4.17bn | 11% | 9.1 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 121,120 | 8,709 | ₦867m | ₦867m | 5% | 16.4 yr |
| Residential Small | 39,677 | 5,529 | ₦4.55bn | ₦4.45bn | 29% | 3.6 yr |
| Residential | 9,906 | 2,213 | ₦9.19bn | ₦9.04bn | 29% | 3.6 yr |
| Residential Formal | 7,606 | 1,855 | ₦1.11bn | ₦1.11bn | 23% | 4.4 yr |
| Residential Informal | 6,451 | 819 | ₦357m | ₦357m | 25% | 4.1 yr |
| Kiosk Shop | 1,153 | 1,033 | ₦171m | ₦171m | 63% | 1.6 yr |
| Commercial Corridor | 547 | 433 | ₦1.15bn | ₦1.15bn | 61% | 1.6 yr |
| Institutional | 343 | 252 | ₦833m | ₦833m | 57% | 1.9 yr |
| Apartment | 183 | 145 | ₦119m | ₦119m | 61% | 1.9 yr |
| Educational Facility | 160 | 129 | ₦224m | ₦224m | 87% | 1.1 yr |
| Worship Center | 133 | 88 | ₦21.7m | ₦21.7m | 61% | 1.6 yr |
| Commercial | 125 | 107 | ₦118m | ₦118m | 41% | 2.6 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 187,893 | 21,662 | ₦20.2bn | ₦19.9bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 186,787 | 20,789 | ₦16.8bn | ₦16.6bn | 9% | 13.6 yr |
| SME High | 672 | 540 | ₦1.26bn | ₦1.26bn | 61% | 1.6 yr |
| Enterprise | 434 | 333 | ₦2.11bn | ₦2.06bn | 61% | 1.6 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 120,132 | 8,553 | ₦856m | ₦856m |
| 2.0 | 23,069 | 3,609 | ₦3.48bn | ₦3.41bn |
| 3.0 | 19,988 | 4,650 | ₦11.9bn | ₦11.7bn |
| 1.0 | 15,476 | 2,322 | ₦1.3bn | ₦1.3bn |
| 4.0 | 9,153 | 2,478 | ₦2.05bn | ₦2.05bn |
| 5.0 | 73 | 50 | ₦595m | ₦595m |
| 6.0 | 2 | 0 | ₦13m | ₦13m |
Not published for this cube: Median IRR, Median payback.