Kebbi State
Rooftop solar in Bunza, Kebbi: what the roofs are worth
Bunza has 66,934 buildings with a viable rooftop and 433 MWp of roof capacity. 8% run a generator, and together they spend ₦10.6bn a year on energy.
66,934
1.96 km²
433 MWp roof capacity
₦10.6bn/yr
8.96 GWh/yr burned on generators
13.1 yr
Median IRR 9% (cash saved)
The savings bracket for Bunza
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Bunza's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 54.4 MWp
- Capital cost
- ₦59bn
- Year 1 savings
- ₦63.1bn/yr
- NPV
- ₦516bn
- Median IRR
- 105%
- Median payback
- 1.1 yr
The odds a rooftop in Bunza pays back quickly
Of the 65,647 buildings in Bunza with a modelled payback, 31.4% pay back inside five years and 8.0% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Bunza's demand actually gets met
Buildings in Bunza consume 18 GWh/yr but want 27.5 GWh/yr. The 35% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Bunza
Loading band economics…
How many rooftops in Bunza actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 65,647 buildings with a modelled result out of 66,934 in Bunza. 25,049 clear a positive NPV.
Payback
Return (IRR)
19 kt/yr
4.68 million litres/yr
9.54 GWh/yr
Demand that is suppressed today
221k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Bunza.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Bunza
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| D | 29,306 | 1,750 | ₦2.48bn | ₦2.35bn | 7% | 14.4 yr |
| E | 20,845 | 1,407 | ₦3.02bn | ₦2.68bn | 7% | 14.6 yr |
| C | 16,783 | 2,068 | ₦5.08bn | ₦4.76bn | 21% | 5.1 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 66,312 | 4,704 | ₦8.32bn | ₦7.53bn | 9% | 13.1 yr |
| Worship | 200 | 154 | ₦42.5m | ₦42.5m | 59% | 1.9 yr |
| Anchor | 195 | 166 | ₦992m | ₦992m | 67% | 1.6 yr |
| Commercial General | 178 | 152 | ₦1.18bn | ₦1.18bn | 59% | 1.9 yr |
| Commercial Retail | 46 | 46 | ₦44m | ₦44m | 59% | 1.9 yr |
| Industrial | 3 | 3 | ₦1.93m | ₦1.93m | 71% | 1.4 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 38,666 | 1,930 | ₦293m | ₦293m | 5% | 16.1 yr |
| 50 100m2 | 13,363 | 1,412 | ₦2.54bn | ₦2.3bn | 29% | 3.6 yr |
| 30 50m2 | 10,571 | 814 | ₦443m | ₦360m | 11% | 9.1 yr |
| 100 250m2 | 3,841 | 875 | ₦3.91bn | ₦3.45bn | 31% | 3.6 yr |
| 250 1000m2 | 480 | 184 | ₦2.58bn | ₦2.58bn | 31% | 3.4 yr |
| Over 1000m2 | 13 | 10 | ₦817m | ₦817m | 59% | 1.9 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Rural | 20,890 | 2,008 | ₦2.45bn | ₦2.28bn | 9% | 13.4 yr |
| Unclassified | 14,848 | 764 | ₦2.69bn | ₦2.28bn | 5% | 16.1 yr |
| Urban Centre | 12,168 | 1,502 | ₦3.48bn | ₦3.48bn | 21% | 4.9 yr |
| Dense Urban | 11,608 | 521 | ₦652m | ₦652m | 9% | 13.1 yr |
| Urban | 7,420 | 430 | ₦1.31bn | ₦1.1bn | 7% | 15.1 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 40,053 | 1,834 | ₦239m | ₦239m | 7% | 15.6 yr |
| Residential Small | 14,154 | 1,755 | ₦2.96bn | ₦2.62bn | 29% | 3.6 yr |
| Residential | 6,388 | 809 | ₦4.8bn | ₦4.37bn | 21% | 4.9 yr |
| Residential Formal | 2,951 | 0 | ₦25.1m | ₦25.1m | 11% | 7.9 yr |
| Residential Informal | 2,762 | 306 | ₦286m | ₦286m | 29% | 3.9 yr |
| Institutional | 171 | 140 | ₦279m | ₦279m | 57% | 1.9 yr |
| Educational Facility | 79 | 67 | ₦180m | ₦180m | 87% | 1.1 yr |
| Worship Center | 69 | 54 | ₦10.7m | ₦10.7m | 65% | 1.6 yr |
| Place Of Worship | 62 | 47 | ₦5.23m | ₦5.23m | 61% | 1.6 yr |
| Commercial Corridor | 51 | 51 | ₦877m | ₦877m | 63% | 1.6 yr |
| Kiosk Shop | 46 | 46 | ₦44m | ₦44m | 59% | 1.9 yr |
| Healthcare Facility | 42 | 36 | ₦322m | ₦322m | 57% | 1.9 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 66,934 | 5,225 | ₦10.6bn | ₦9.8bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 66,681 | 5,001 | ₦8.64bn | ₦7.85bn | 9% | 13.1 yr |
| Enterprise | 198 | 169 | ₦994m | ₦994m | 69% | 1.4 yr |
| SME High | 55 | 55 | ₦950m | ₦950m | 63% | 1.6 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 40,092 | 1,864 | ₦241m | ₦241m |
| 2.0 | 11,405 | 1,244 | ₦2.29bn | ₦2.21bn |
| 3.0 | 6,883 | 1,479 | ₦6.17bn | ₦5.76bn |
| 1.0 | 5,807 | 523 | ₦833m | ₦535m |
| 4.0 | 2,744 | 112 | ₦907m | ₦907m |
| 5.0 | 3 | 3 | ₦134m | ₦134m |
Not published for this cube: Median IRR, Median payback.