    Rooftop solar in Kunchi, Kano: what the roofs are worth

    Kunchi has 57,494 buildings with a viable rooftop and 264 MWp of roof capacity. 12% run a generator, and together they spend ₦5.21bn a year on energy.

    Viable buildings

    57,494

    Usable roof area

    1.21 km²

    264 MWp roof capacity

    Energy spend

    ₦5.21bn/yr

    4.11 GWh/yr burned on generators

    Median payback

    14.6 yr

    Median IRR 7% (cash saved)

    The savings bracket for Kunchi

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦5.21bn/yr
    Year-one cash saved₦4.73bn
    Lifetime cash saved₦256bn
    NPV₦38.6bn
    Median IRR7%
    Median payback14.6 yr
    Unlocked energy6.25 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity38 MWp
    Capex₦41.6bn
    Year-one energy value₦47.9bn
    Lifetime energy value₦2.26tn
    NPV₦395bn
    Median IRR107%
    Median payback0.9 yr

    Three ways to size Kunchi's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    38 MWp
    Capital cost
    ₦41.6bn
    Year 1 savings
    ₦47.9bn/yr
    NPV
    ₦395bn
    Median IRR
    107%
    Median payback
    0.9 yr

    The odds a rooftop in Kunchi pays back quickly

    Of the 57,339 buildings in Kunchi with a modelled payback, 26.5% pay back inside five years and 11.7% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Kunchi's demand actually gets met

    Buildings in Kunchi consume 9.49 GWh/yr but want 15.7 GWh/yr. The 40% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Kunchi

    Loading band economics…

    How many rooftops in Kunchi actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 57,339 buildings with a modelled result out of 57,494 in Kunchi. 18,474 clear a positive NPV.

    Payback

    Under 3 years6,704 (12%)
    Under 5 years15,223 (27%)
    Under 7 years18,514 (32%)
    Under 10 years22,889 (40%)

    Return (IRR)

    Above 10%21,134 (37%)
    Above 15%18,474 (32%)
    Above 20%16,009 (28%)
    Above 25%14,206 (25%)
    CO₂ avoided

    10.1 kt/yr

    Fuel avoided

    2.17 million litres/yr

    Energy unlocked

    6.25 GWh/yr

    Demand that is suppressed today

    People served

    200k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Kunchi.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Kunchi

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    D19,3022,201₦1.35bn₦1.22bn7%15.1 yr
    C17,7872,346₦1.5bn₦1.45bn7%14.9 yr
    E16,8451,741₦2bn₦1.71bn7%15.4 yr
    B3,504395₦344m₦344m21%5.1 yr
    A560₦2.89m₦2.89m11%8.1 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential56,4575,718₦4.31bn₦3.84bn7%14.9 yr
    Commercial General428399₦290m₦290m41%2.6 yr
    Anchor290264₦546m₦546m83%1.4 yr
    Commercial Retail218206₦27.2m₦27.2m61%1.6 yr
    Worship8985₦22.3m₦22.3m63%1.6 yr
    Industrial1211₦8.92m₦8.92m77%1.4 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m236,5052,947₦306m₦299m5%17.1 yr
    30 50m213,2561,901₦605m₦605m11%9.4 yr
    50 100m26,4271,322₦1.66bn₦1.48bn31%3.4 yr
    100 250m21,190446₦1.74bn₦1.45bn33%3.4 yr
    250 1000m211062₦700m₦700m57%1.9 yr
    Over 1000m265₦198m₦198m53%1.6 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban40,5416,430₦4.21bn₦3.74bn9%13.9 yr
    Unclassified15,103146₦557m₦551m5%16.1 yr
    Rural1,0429₦14.8m₦14.8m5%16.6 yr
    Dense Urban80898₦427m₦427m11%9.1 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed41,1972,672₦210m₦210m5%16.4 yr
    Residential Small10,7622,219₦2.08bn₦1.9bn31%3.4 yr
    Residential4,498827₦2.03bn₦1.73bn23%4.9 yr
    Kiosk Shop218206₦27.2m₦27.2m61%1.6 yr
    Market201190₦21.9m₦21.9m41%2.6 yr
    Institutional175159₦242m₦242m59%1.9 yr
    Educational Facility10194₦67.8m₦67.8m87%1.1 yr
    School9084₦58.2m₦58.2m87%1.1 yr
    Commercial Corridor6158₦73.1m₦73.1m63%1.6 yr
    Hospital3533₦59.7m₦59.7m59%1.9 yr
    Healthcare Facility3428₦265m₦265m57%1.9 yr
    Worship Center3030₦7.14m₦7.14m65%1.6 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)57,4946,683₦5.21bn₦4.73bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard57,1086,327₦4.53bn₦4.06bn7%14.6 yr
    Enterprise302275₦555m₦555m81%1.4 yr
    SME High8481₦120m₦120m67%1.6 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.041,2072,681₦210m₦210m
    2.08,1971,909₦1.88bn₦1.64bn
    1.04,865983₦482m₦479m
    3.03,2111,096₦2.57bn₦2.33bn
    4.01414₦68.9m₦68.9m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Kano