    Kano State

    Rooftop solar in Dawakin Kudu, Kano: what the roofs are worth

    Dawakin Kudu has 154,341 buildings with a viable rooftop and 1.09 GWp of roof capacity. 16% run a generator, and together they spend ₦36.7bn a year on energy.

    Viable buildings

    154,341

    Usable roof area

    4.95 km²

    1.09 GWp roof capacity

    Energy spend

    ₦36.7bn/yr

    28.9 GWh/yr burned on generators

    Median payback

    5.1 yr

    Median IRR 21% (cash saved)

    The savings bracket for Dawakin Kudu

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦36.7bn/yr
    Year-one cash saved₦35.7bn
    Lifetime cash saved₦1.95tn
    NPV₦294bn
    Median IRR21%
    Median payback5.1 yr
    Unlocked energy37.8 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity154 MWp
    Capex₦159bn
    Year-one energy value₦145bn
    Lifetime energy value₦6.83tn
    NPV₦1.16tn
    Median IRR95%
    Median payback1.1 yr

    Three ways to size Dawakin Kudu's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    154 MWp
    Capital cost
    ₦159bn
    Year 1 savings
    ₦145bn/yr
    NPV
    ₦1.16tn
    Median IRR
    95%
    Median payback
    1.1 yr

    The odds a rooftop in Dawakin Kudu pays back quickly

    Of the 153,177 buildings in Dawakin Kudu with a modelled payback, 48.0% pay back inside five years and 19.1% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Dawakin Kudu's demand actually gets met

    Buildings in Dawakin Kudu consume 74.8 GWh/yr but want 113 GWh/yr. The 34% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Dawakin Kudu

    Loading band economics…

    How many rooftops in Dawakin Kudu actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 153,177 buildings with a modelled result out of 154,341 in Dawakin Kudu. 96,936 clear a positive NPV.

    Payback

    Under 3 years29,275 (19%)
    Under 5 years73,597 (48%)
    Under 7 years97,219 (63%)
    Under 10 years116,957 (76%)

    Return (IRR)

    Above 10%112,227 (73%)
    Above 15%96,936 (63%)
    Above 20%79,382 (51%)
    Above 25%64,381 (42%)
    CO₂ avoided

    72 kt/yr

    Fuel avoided

    15.2 million litres/yr

    Energy unlocked

    37.8 GWh/yr

    Demand that is suppressed today

    People served

    471k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Dawakin Kudu.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Dawakin Kudu

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    A69,12313,444₦23.9bn₦23.8bn27%4.1 yr
    B28,9123,152₦5.74bn₦5.38bn21%5.1 yr
    C20,4253,135₦2.9bn₦2.6bn11%9.1 yr
    E18,1642,697₦2.48bn₦2.42bn9%13.1 yr
    D17,7172,100₦1.7bn₦1.46bn9%13.6 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential143,70821,732₦24.9bn₦23.9bn19%5.6 yr
    Commercial Retail6,5071,417₦511m₦511m37%2.9 yr
    Commercial General3,4631,064₦5.87bn₦5.85bn37%2.9 yr
    Anchor509236₦5.22bn₦5.22bn49%2.1 yr
    Worship11865₦23.3m₦23.3m39%2.6 yr
    Industrial3113₦174m₦174m41%2.6 yr
    Filling Station21₦3.54m₦3.54m39%2.1 yr
    Mall Retail20₦197k₦197k37%2.9 yr
    Productive Use10₦43.1k₦43.1k37%2.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m277,1339,992₦1.13bn₦1.12bn13%8.1 yr
    30 50m241,4116,832₦2.06bn₦2.02bn21%4.9 yr
    50 100m225,5124,954₦4.97bn₦4.91bn31%3.6 yr
    100 250m28,5091,921₦6.99bn₦6.31bn31%3.4 yr
    250 1000m21,644734₦12.7bn₦12.5bn39%2.9 yr
    Over 1000m213295₦8.84bn₦8.84bn59%1.9 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban57,6348,145₦9.82bn₦9.25bn11%8.9 yr
    Urban Centre46,39511,881₦21.6bn₦21.5bn29%3.6 yr
    Dense Urban44,4864,228₦3.12bn₦2.99bn21%5.4 yr
    Unclassified5,826274₦2.14bn₦1.88bn11%8.6 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed62,6319,456₦706m₦706m9%9.9 yr
    Residential Small29,7417,238₦5.73bn₦5.66bn31%3.6 yr
    Residential Formal23,6930₦365m₦365m21%5.1 yr
    Residential15,2794,304₦17.7bn₦16.8bn29%3.6 yr
    Residential Informal12,308734₦371m₦371m21%4.9 yr
    Kiosk Shop6,5071,417₦511m₦511m37%2.9 yr
    Commercial2,164588₦4.75bn₦4.73bn37%2.9 yr
    Commercial Corridor512124₦754m₦754m37%2.9 yr
    Market461213₦33.6m₦33.6m37%2.9 yr
    Institutional309149₦4.95bn₦4.95bn35%3.1 yr
    Educational Facility21299₦149m₦149m49%2.1 yr
    School19789₦61m₦61m49%2.1 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)154,34124,528₦36.7bn₦35.7bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard151,14723,573₦25.8bn₦24.8bn21%5.4 yr
    SME High2,679713₦5.51bn₦5.49bn37%2.9 yr
    Enterprise515242₦5.4bn₦5.39bn49%2.1 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.062,7859,501₦709m₦709m
    2.033,3576,738₦5.05bn₦4.65bn
    3.023,2074,827₦22.9bn₦22.4bn
    4.019,635212₦2.89bn₦2.89bn
    1.014,2703,007₦1.33bn₦1.25bn
    5.0953210₦2.58bn₦2.57bn
    6.013433₦1.21bn₦1.2bn

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Kano