    Rooftop solar in Garun Malam, Kano: what the roofs are worth

    Garun Malam has 50,980 buildings with a viable rooftop and 367k kWp of roof capacity. 57% run a generator, and together they spend ₦13.2bn a year on energy.

    Viable buildings

    50,980

    Usable roof area

    1.66m m²

    367k kWp roof capacity

    Energy spend

    ₦13.2bn/yr

    10.6m kWh/yr burned on generators

    Median payback

    3.4 yr

    Median IRR 31% (cash saved)

    The savings bracket for Garun Malam

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦13.2bn/yr
    Year-one cash saved₦13bn
    Lifetime cash saved₦549bn
    NPV₦86bn
    Median IRR31%
    Median payback3.4 yr
    Unlocked energy15.5m kWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity88.4k kWp
    Capex₦84.2bn
    Year-one energy value₦92.8bn
    Lifetime energy value₦4.3tn
    NPV₦750bn
    Median IRR117%
    Median payback0.9 yr

    Three ways to size Garun Malam's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    88.4k kWp
    Capital cost
    ₦84.2bn
    Year 1 savings
    ₦92.8bn/yr
    NPV
    ₦750bn
    Median IRR
    117%
    Median payback
    0.9 yr

    How many rooftops in Garun Malam actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. 50,980 of 50,980 clear a positive NPV.

    Payback

    Under 3 years23,444 (46%)
    Under 5 years31,530 (62%)
    Under 7 years50,980 (100%)
    Under 10 years50,980 (100%)

    Return (IRR)

    Above 10%50,980 (100%)
    Above 15%50,980 (100%)
    Above 20%50,980 (100%)
    Above 25%31,098 (61%)
    CO₂ avoided

    26.8m kg/yr

    Fuel avoided

    6.49m L/yr

    Energy unlocked

    15.5m kWh/yr

    Demand that is suppressed today

    People served

    180k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Garun Malam.

    Solar panels

    250

    ₦/W

    Inverters

    127,419

    ₦/kVA

    Batteries

    177,500

    ₦/kWh

    Building mix in Garun Malam

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential47,23127,845₦10.7bn₦10.5bn33%3.4 yr
    Commercial Retail2,531487₦117m₦117m25%4.1 yr
    Commercial General976400₦1.23bn₦1.23bn25%4.1 yr
    Anchor222152₦1.09bn₦1.09bn47%2.1 yr
    Industrial207₦8.71m₦8.71m29%3.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m224,82514,088₦530m₦530m31%3.4 yr
    30 50m212,6637,070₦1.1bn₦1.1bn29%3.6 yr
    50 100m29,7165,512₦3.72bn₦3.65bn31%3.6 yr
    100 250m23,3691,928₦3.71bn₦3.59bn31%3.4 yr
    250 1000m2373264₦2.18bn₦2.17bn47%2.4 yr
    Over 1000m23429₦1.95bn₦1.95bn67%1.4 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Dense Urban29,91311,151₦5.37bn₦5.35bn21%5.4 yr
    Urban15,18514,044₦6.46bn₦6.29bn71%1.4 yr
    Rural3,7941,956₦372m₦372m25%4.6 yr
    Unclassified2,0881,740₦995m₦983m53%2.1 yr

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard49,92228,426₦11bn₦10.8bn31%3.4 yr
    SME High834311₦1.14bn₦1.14bn25%4.1 yr
    Enterprise224154₦1.09bn₦1.09bn47%2.1 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    0.018,41414,222₦375m₦375m
    2.011,9277,269₦3.55bn₦3.45bn
    3.09,1134,071₦7.27bn₦7.17bn
    4.06,57052₦461m₦461m
    1.04,6803,271₦1.13bn₦1.12bn
    5.02644₦201m₦201m
    6.0122₦204m₦204m

    Nearby LGAs in Kano

    How these numbers are produced

    Approach A — energy value (upper bracket)

    Sizes the system to the building's full latent demand and values that energy at the mixed grid/generator tariff. It answers what the energy is worth — not what anyone currently pays.

    Approach B — cash saved (lower bracket)

    Sizes the system to demand that is actually served today, values it by merit order (solar displaces generator kWh first) and caps it at current spend. It answers what a building stops paying.

    Cohort: Viable rooftops (≥0.6 kWp potential).

    • Demand is modelled latent demand, not metered consumption.
    • Fuel is priced at ₦1,800/litre (operator-set). NBS reported ₦3,277/litre for May 2026 — on that basis every naira figure here is roughly 1.8× understated.
    • Generator ownership is a model output, not a survey result: it follows from the grid-availability scale and the 25% demand-suppression assumption.
    • Approach A prices energy nobody currently buys. Its savings must never be read as cash saved.
    • Demand is MODELLED LATENT demand, not metered consumption.
    • Generator ownership is model output, not survey.
    • Medians do not combine across groups — re-derive from the histograms.
    • Per-building files are float32 with 4 significant figures; cast to float64 before summing, because polars keeps Float32 sums in Float32.
    • Null scenario fields mean the roof cannot host 0.6 kWp, not zero savings.
    • `genset` was previously named `diesel` and now uses the segment's real fuel.
    • Ordering holds by construction: grid savings < mixed < genset.