    Rooftop solar in Bebeji, Kano: what the roofs are worth

    Bebeji has 101,694 buildings with a viable rooftop and 798 MWp of roof capacity. 14% run a generator, and together they spend ₦31.9bn a year on energy.

    Viable buildings

    101,694

    Usable roof area

    3.61 km²

    798 MWp roof capacity

    Energy spend

    ₦31.9bn/yr

    26.9 GWh/yr burned on generators

    Median payback

    5.6 yr

    Median IRR 19% (cash saved)

    The savings bracket for Bebeji

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦31.9bn/yr
    Year-one cash saved₦31.1bn
    Lifetime cash saved₦1.65tn
    NPV₦253bn
    Median IRR19%
    Median payback5.6 yr
    Unlocked energy23.7 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity121 MWp
    Capex₦129bn
    Year-one energy value₦131bn
    Lifetime energy value₦6.19tn
    NPV₦1.06tn
    Median IRR103%
    Median payback1.1 yr

    Three ways to size Bebeji's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    121 MWp
    Capital cost
    ₦129bn
    Year 1 savings
    ₦131bn/yr
    NPV
    ₦1.06tn
    Median IRR
    103%
    Median payback
    1.1 yr

    The odds a rooftop in Bebeji pays back quickly

    Of the 100,907 buildings in Bebeji with a modelled payback, 43.2% pay back inside five years and 14.5% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Bebeji's demand actually gets met

    Buildings in Bebeji consume 55.5 GWh/yr but want 79.1 GWh/yr. The 30% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Bebeji

    Loading band economics…

    How many rooftops in Bebeji actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 100,907 buildings with a modelled result out of 101,694 in Bebeji. 58,974 clear a positive NPV.

    Payback

    Under 3 years14,582 (14%)
    Under 5 years43,592 (43%)
    Under 7 years59,130 (59%)
    Under 10 years70,805 (70%)

    Return (IRR)

    Above 10%67,390 (66%)
    Above 15%58,974 (58%)
    Above 20%47,473 (47%)
    Above 25%38,938 (38%)
    CO₂ avoided

    57.7 kt/yr

    Fuel avoided

    14.9 million litres/yr

    Energy unlocked

    23.7 GWh/yr

    Demand that is suppressed today

    People served

    439k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Bebeji.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Bebeji

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    B32,5823,930₦6.41bn₦6.37bn21%5.4 yr
    C20,2002,328₦11.4bn₦10.7bn15%7.1 yr
    D19,0602,265₦3.26bn₦3.26bn9%13.4 yr
    E17,0131,709₦3.27bn₦3.25bn9%13.1 yr
    A12,8394,055₦7.59bn₦7.57bn31%3.6 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential99,45213,121₦23.5bn₦22.7bn19%5.9 yr
    Commercial Retail1,109539₦56.5m₦56.5m37%2.9 yr
    Commercial General665350₦584m₦584m39%2.9 yr
    Anchor380239₦7.75bn₦7.75bn53%1.9 yr
    Worship6732₦21.4m₦21.4m37%2.9 yr
    Industrial216₦11.8m₦11.8m41%2.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m244,8735,055₦423m₦421m7%13.9 yr
    30 50m228,0703,643₦1.03bn₦1.03bn19%5.9 yr
    50 100m220,9423,342₦4.03bn₦3.95bn31%3.4 yr
    100 250m26,7861,720₦5.88bn₦5.84bn31%3.4 yr
    250 1000m2899427₦8.99bn₦8.3bn33%3.1 yr
    Over 1000m2124100₦11.6bn₦11.6bn91%1.1 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban47,8887,449₦17.9bn₦17.1bn17%6.1 yr
    Dense Urban31,5645,843₦3.58bn₦3.58bn23%4.6 yr
    Unclassified13,231638₦9.97bn₦9.96bn7%14.4 yr
    Rural9,011357₦444m₦444m9%9.6 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed50,2035,771₦489m₦489m9%13.4 yr
    Residential Small22,7344,744₦4.81bn₦4.72bn31%3.4 yr
    Residential Formal12,2710₦129m₦129m17%6.4 yr
    Residential9,4572,587₦17.9bn₦17.2bn31%3.4 yr
    Residential Informal4,74419₦217m₦214m23%4.6 yr
    Kiosk Shop1,109539₦56.5m₦56.5m37%2.9 yr
    Commercial286170₦186m₦186m39%2.9 yr
    Institutional210127₦7.09bn₦7.09bn45%2.4 yr
    Commercial Corridor18065₦224m₦224m37%2.9 yr
    Educational Facility13994₦90.3m₦90.3m73%1.4 yr
    School9963₦45.7m₦45.7m63%1.6 yr
    Hospital5229₦92.4m₦92.4m35%3.1 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)101,63814,272₦31.9bn₦31.1bn
    Industrial5615₦17.1m₦17.1m

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard100,83813,809₦23.8bn₦23bn19%5.9 yr
    SME High466235₦409m₦409m39%2.9 yr
    Enterprise390243₦7.75bn₦7.75bn53%2.1 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.050,2125,777₦490m₦490m
    2.018,2233,254₦4.06bn₦4bn
    3.013,4103,608₦25.3bn₦24.6bn
    4.011,00950₦661m₦661m
    1.08,8201,596₦1.27bn₦1.23bn
    5.0151₦34.8m₦34.8m
    6.051₦97.2m₦97.2m

    Not published for this cube: Median IRR, Median payback.