PureWatts AI

    Solar energy assistant

    📍 Home

    Hi there! 👋

    I'm your PureWatts AI assistant. Ask me anything about solar energy, system sizing, or how to use the platform.

    Skip to content

    Kano State

    Rooftop solar in Bagwai, Kano: what the roofs are worth

    Bagwai has 90,078 buildings with a viable rooftop and 419 MWp of roof capacity. 11% run a generator, and together they spend ₦9.53bn a year on energy.

    Viable buildings

    90,078

    Usable roof area

    1.92 km²

    419 MWp roof capacity

    Energy spend

    ₦9.53bn/yr

    7.25 GWh/yr burned on generators

    Median payback

    13.4 yr

    Median IRR 9% (cash saved)

    The savings bracket for Bagwai

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦9.53bn/yr
    Year-one cash saved₦9.43bn
    Lifetime cash saved₦513bn
    NPV₦77.3bn
    Median IRR9%
    Median payback13.4 yr
    Unlocked energy12.1 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity65.3 MWp
    Capex₦71.4bn
    Year-one energy value₦80bn
    Lifetime energy value₦3.77tn
    NPV₦657bn
    Median IRR105%
    Median payback1.1 yr

    Three ways to size Bagwai's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    65.3 MWp
    Capital cost
    ₦71.4bn
    Year 1 savings
    ₦80bn/yr
    NPV
    ₦657bn
    Median IRR
    105%
    Median payback
    1.1 yr

    The odds a rooftop in Bagwai pays back quickly

    Of the 89,660 buildings in Bagwai with a modelled payback, 29.9% pay back inside five years and 11.2% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Bagwai's demand actually gets met

    Buildings in Bagwai consume 18.6 GWh/yr but want 30.6 GWh/yr. The 39% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Bagwai

    Loading band economics…

    How many rooftops in Bagwai actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 89,660 buildings with a modelled result out of 90,078 in Bagwai. 35,919 clear a positive NPV.

    Payback

    Under 3 years10,012 (11%)
    Under 5 years26,818 (30%)
    Under 7 years36,030 (40%)
    Under 10 years43,093 (48%)

    Return (IRR)

    Above 10%40,498 (45%)
    Above 15%35,919 (40%)
    Above 20%28,745 (32%)
    Above 25%24,500 (27%)
    CO₂ avoided

    20.1 kt/yr

    Fuel avoided

    4.26 million litres/yr

    Energy unlocked

    12.1 GWh/yr

    Demand that is suppressed today

    People served

    324k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Bagwai.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Bagwai

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    C26,1432,123₦3.11bn₦3.05bn7%14.4 yr
    D26,0292,381₦1.93bn₦1.93bn7%15.4 yr
    E19,6642,162₦1.54bn₦1.54bn7%14.9 yr
    B17,9723,518₦2.73bn₦2.69bn23%4.6 yr
    A270101₦231m₦231m31%3.4 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential89,4909,844₦7.92bn₦7.82bn9%13.4 yr
    Anchor343254₦1.47bn₦1.47bn61%1.6 yr
    Commercial General189144₦120m₦120m55%1.9 yr
    Worship2316₦4.96m₦4.96m53%1.9 yr
    Commercial Retail1616₦2.44m₦2.44m53%1.9 yr
    Industrial1511₦6.45m₦6.45m67%1.6 yr
    Hospitality10₦33.7k₦33.7k37%2.9 yr
    Productive Use10₦109k₦109k37%2.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m257,4835,446₦442m₦442m5%15.9 yr
    30 50m220,7072,542₦929m₦929m11%8.9 yr
    50 100m29,8251,630₦2.68bn₦2.66bn31%3.4 yr
    100 250m21,827547₦2.08bn₦2.02bn31%3.4 yr
    250 1000m2214105₦2.01bn₦2bn33%3.1 yr
    Over 1000m22215₦1.38bn₦1.38bn65%1.6 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban74,1537,865₦6.57bn₦6.49bn7%14.1 yr
    Dense Urban10,2582,304₦1.37bn₦1.37bn25%4.4 yr
    Unclassified5,667116₦1.59bn₦1.57bn5%17.1 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed64,1015,053₦382m₦382m7%15.6 yr
    Residential Small17,4133,187₦3.5bn₦3.48bn31%3.4 yr
    Residential6,6431,502₦3.9bn₦3.82bn27%3.9 yr
    Residential Informal1,333102₦136m₦136m31%3.6 yr
    Institutional184140₦1.24bn₦1.24bn55%1.9 yr
    Educational Facility12594₦62.8m₦62.8m81%1.4 yr
    School11987₦32.3m₦32.3m75%1.4 yr
    Healthcare Facility3626₦196m₦196m55%1.9 yr
    Clinic2820₦10.7m₦10.7m55%1.9 yr
    Hospital2719₦37m₦37m53%2.1 yr
    Kiosk Shop1716₦2.55m₦2.55m53%1.9 yr
    Industrial Site1511₦6.45m₦6.45m67%1.6 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)90,03510,244₦8.35bn₦8.28bn
    Industrial4141₦1.18bn₦1.15bn
    Farmland20₦9.75k₦9.75k

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard89,72110,019₦8.04bn₦7.94bn9%13.4 yr
    Enterprise349260₦1.48bn₦1.48bn61%1.6 yr
    SME High86₦12.8m₦12.8m55%1.9 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.064,1105,062₦383m₦383m
    2.013,3912,573₦2.4bn₦2.4bn
    1.06,5591,063₦842m₦842m
    3.05,8181,571₦5.82bn₦5.72bn
    4.020016₦82.2m₦82.2m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Kano