Yakurr has 31,003 buildings with a viable rooftop and 833 MWp of roof capacity. 55% run a generator, and together they spend ₦67.4bn a year on energy.
31,003
3.7 km²
833 MWp roof capacity
₦67.4bn/yr
63.4 GWh/yr burned on generators
2.1 yr
Median IRR 47% (cash saved)
The savings bracket for Yakurr
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Yakurr's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 159 MWp
- Capital cost
- ₦160bn
- Year 1 savings
- ₦139bn/yr
- NPV
- ₦1.1tn
- Median IRR
- 91%
- Median payback
- 1.1 yr
The odds a rooftop in Yakurr pays back quickly
Of the 30,822 buildings in Yakurr with a modelled payback, 83.1% pay back inside five years and 54.3% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Yakurr's demand actually gets met
Buildings in Yakurr consume 88.7 GWh/yr but want 123 GWh/yr. The 28% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Yakurr
Loading band economics…
How many rooftops in Yakurr actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 30,822 buildings with a modelled result out of 31,003 in Yakurr. 27,519 clear a positive NPV.
Payback
Return (IRR)
109 kt/yr
35.5 million litres/yr
34.5 GWh/yr
Demand that is suppressed today
263k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Yakurr.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Yakurr
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| D | 18,380 | 10,479 | ₦37.4bn | ₦36.5bn | 47% | 2.4 yr |
| E | 12,623 | 6,538 | ₦30bn | ₦28bn | 55% | 1.9 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 28,629 | 14,768 | ₦52.9bn | ₦50.5bn | 41% | 2.4 yr |
| Commercial General | 973 | 936 | ₦5.15bn | ₦5.08bn | 53% | 2.1 yr |
| Anchor | 436 | 410 | ₦5.45bn | ₦5.16bn | 69% | 1.6 yr |
| Worship | 420 | 397 | ₦1.37bn | ₦1.37bn | 59% | 1.9 yr |
| Industrial | 323 | 288 | ₦1.96bn | ₦1.95bn | 69% | 1.6 yr |
| Commercial Retail | 198 | 196 | ₦59m | ₦59m | 43% | 2.4 yr |
| Filling Station | 19 | 19 | ₦79.4m | ₦79.4m | 63% | 1.6 yr |
| Hospitality | 4 | 2 | ₦401m | ₦362m | 35% | 1.4 yr |
| Productive Use | 1 | 1 | ₦5.62m | ₦5.62m | 59% | 1.9 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| 100 250m2 | 11,357 | 6,494 | ₦23bn | ₦21.8bn | 51% | 2.1 yr |
| 50 100m2 | 6,584 | 3,559 | ₦3.45bn | ₦3.39bn | 45% | 2.4 yr |
| 250 1000m2 | 4,971 | 3,059 | ₦35.6bn | ₦34.2bn | 59% | 1.9 yr |
| Under 30m2 | 4,422 | 2,002 | ₦468m | ₦460m | 19% | 5.4 yr |
| 30 50m2 | 3,628 | 1,871 | ₦821m | ₦816m | 41% | 2.6 yr |
| Over 1000m2 | 41 | 32 | ₦4.07bn | ₦3.95bn | 63% | 1.6 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Urban Centre | 10,063 | 5,432 | ₦23.4bn | ₦23.2bn | 43% | 2.4 yr |
| Dense Urban | 9,036 | 6,332 | ₦19.7bn | ₦19.3bn | 59% | 1.9 yr |
| Urban | 5,917 | 3,161 | ₦15.1bn | ₦13.6bn | 57% | 1.9 yr |
| Unclassified | 5,038 | 1,802 | ₦8.56bn | ₦7.69bn | 25% | 4.4 yr |
| Rural | 949 | 290 | ₦725m | ₦725m | 25% | 4.4 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential Formal | 11,153 | 6,605 | ₦13.7bn | ₦13.7bn | 49% | 2.1 yr |
| Residential | 7,552 | 3,773 | ₦35.3bn | ₦33bn | 27% | 1.9 yr |
| Residential Small | 7,257 | 3,653 | ₦3.76bn | ₦3.7bn | 55% | 1.9 yr |
| Shed | 2,560 | 684 | ₦107m | ₦107m | 7% | 13.6 yr |
| Institutional | 619 | 577 | ₦5.42bn | ₦5.39bn | 57% | 1.9 yr |
| Commercial Corridor | 452 | 448 | ₦1.48bn | ₦1.48bn | 45% | 2.4 yr |
| Industrial Site | 282 | 253 | ₦1.81bn | ₦1.79bn | 71% | 1.4 yr |
| Kiosk Shop | 199 | 197 | ₦64.6m | ₦64.6m | 43% | 2.4 yr |
| Educational Facility | 154 | 148 | ₦882m | ₦882m | 81% | 1.4 yr |
| Worship Center | 149 | 141 | ₦214m | ₦214m | 63% | 1.6 yr |
| Place Of Worship | 128 | 121 | ₦167m | ₦167m | 63% | 1.6 yr |
| School | 112 | 106 | ₦375m | ₦375m | 75% | 1.4 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 31,003 | 17,017 | ₦67.4bn | ₦64.6bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 29,734 | 15,814 | ₦57.3bn | ₦54.8bn | 45% | 2.4 yr |
| Enterprise | 759 | 698 | ₦7.41bn | ₦7.11bn | 69% | 1.6 yr |
| SME High | 510 | 505 | ₦2.75bn | ₦2.66bn | 45% | 2.4 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 4.0 | 10,783 | 6,123 | ₦17.8bn | ₦17.7bn |
| 3.0 | 9,018 | 5,478 | ₦42bn | ₦39.9bn |
| 2.0 | 6,751 | 3,736 | ₦5.38bn | ₦4.81bn |
| 0.0 | 2,621 | 698 | ₦126m | ₦126m |
| 1.0 | 1,516 | 676 | ₦301m | ₦301m |
| 5.0 | 265 | 259 | ₦1.31bn | ₦1.25bn |
| 6.0 | 49 | 47 | ₦547m | ₦527m |