    Lagos State

    Rooftop solar in Lagos Mainland, Lagos: what the roofs are worth

    Lagos Mainland has 48,397 buildings with a viable rooftop and 1.11 GWp of roof capacity. 23% run a generator, and together they spend ₦79.3bn a year on energy.

    Viable buildings

    48,397

    Usable roof area

    4.94 km²

    1.11 GWp roof capacity

    Energy spend

    ₦79.3bn/yr

    42.8 GWh/yr burned on generators

    Median payback

    3.9 yr

    Median IRR 29% (cash saved)

    The savings bracket for Lagos Mainland

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦79.3bn/yr
    Year-one cash saved₦76.8bn
    Lifetime cash saved₦4.38tn
    NPV₦590bn
    Median IRR29%
    Median payback3.9 yr
    Unlocked energy101 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity330 MWp
    Capex₦316bn
    Year-one energy value₦159bn
    Lifetime energy value₦7.37tn
    NPV₦1.11tn
    Median IRR53%
    Median payback1.9 yr

    Three ways to size Lagos Mainland's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    330 MWp
    Capital cost
    ₦316bn
    Year 1 savings
    ₦159bn/yr
    NPV
    ₦1.11tn
    Median IRR
    53%
    Median payback
    1.9 yr

    The odds a rooftop in Lagos Mainland pays back quickly

    Of the 47,215 buildings in Lagos Mainland with a modelled payback, 79.2% pay back inside five years and 24.8% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Lagos Mainland's demand actually gets met

    Buildings in Lagos Mainland consume 237 GWh/yr but want 339 GWh/yr. The 30% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Lagos Mainland

    Loading band economics…

    How many rooftops in Lagos Mainland actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 47,215 buildings with a modelled result out of 48,397 in Lagos Mainland. 39,907 clear a positive NPV.

    Payback

    Under 3 years11,706 (25%)
    Under 5 years37,415 (79%)
    Under 7 years39,915 (85%)
    Under 10 years43,354 (92%)

    Return (IRR)

    Above 10%42,845 (89%)
    Above 15%39,907 (82%)
    Above 20%37,976 (78%)
    Above 25%35,976 (74%)
    CO₂ avoided

    175 kt/yr

    Fuel avoided

    21.7 million litres/yr

    Energy unlocked

    101 GWh/yr

    Demand that is suppressed today

    People served

    336k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Lagos Mainland.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Lagos Mainland

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    A29,5736,041₦42.6bn₦41.3bn29%3.6 yr
    B17,9775,097₦36.7bn₦35.5bn29%3.9 yr
    C8450₦6.19m₦6.19m13%8.4 yr
    D20₦2.2k₦2.2k-1%20.9 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential39,1588,672₦42.7bn₦41.4bn29%3.9 yr
    Commercial General4,0821,133₦20.1bn₦19.7bn37%2.9 yr
    Commercial Retail2,399459₦830m₦827m35%3.1 yr
    Anchor1,295435₦10.3bn₦9.86bn45%2.4 yr
    Worship753217₦779m₦758m35%3.1 yr
    Hospitality320106₦3.03bn₦2.66bn37%2.9 yr
    Mall Retail13240₦479m₦468m37%2.9 yr
    Productive Use9925₦138m₦138m37%2.9 yr
    Industrial8723₦883m₦806m39%2.6 yr
    Automotive4521₦106m₦106m33%3.4 yr
    Filling Station277₦28.6m₦28.6m37%2.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m213,5602,406₦915m₦894m25%4.1 yr
    100 250m210,9143,205₦16.2bn₦16bn29%3.6 yr
    50 100m29,1751,986₦2.98bn₦2.89bn29%3.9 yr
    30 50m28,3451,436₦1.04bn₦1.01bn29%3.9 yr
    250 1000m26,0921,966₦37.8bn₦36.7bn31%3.6 yr
    Over 1000m2311139₦20.4bn₦19.4bn39%2.9 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban Centre47,11510,659₦72bn₦70.1bn29%3.9 yr
    Unclassified1,282479₦7.33bn₦6.66bn29%3.6 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential Informal30,0976,756₦33.4bn₦32.7bn29%3.9 yr
    Residential Small3,325907₦1.06bn₦1bn29%3.9 yr
    Shed3,159291₦49.2m₦49.2m13%7.9 yr
    Residential2,575718₦8.15bn₦7.72bn29%3.6 yr
    Kiosk Shop2,242408₦383m₦383m35%3.1 yr
    Commercial Corridor1,648385₦6.58bn₦6.47bn37%2.9 yr
    Commercial912276₦4.39bn₦4.38bn37%2.9 yr
    Institutional658217₦7.73bn₦7.49bn33%3.4 yr
    Commercial495150₦5.18bn₦5.02bn37%2.9 yr
    Educational Facility424152₦1.07bn₦1.07bn47%2.4 yr
    School402142₦573m₦573m47%2.4 yr
    Commercial Retail386124₦1.03bn₦1.02bn37%2.9 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)46,80710,393₦67.2bn₦65.2bn
    Industrial830503₦8.49bn₦8.01bn
    Retail396182₦3.23bn₦3.19bn
    Commercial32460₦366m₦364m
    Farmland400₦16.6m₦16.6m

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard44,3719,986₦54.2bn₦52.6bn29%3.9 yr
    SME High2,709706₦14.2bn₦13.7bn37%2.9 yr
    Enterprise1,317446₦10.9bn₦10.5bn45%2.4 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    4.018,5045,511₦53.4bn₦52bn
    2.012,7122,133₦1.64bn₦1.62bn
    3.010,5752,402₦10.3bn₦9.75bn
    1.02,602507₦162m₦159m
    0.02,349167₦29.3m₦29.3m
    5.01,198292₦4.04bn₦4.03bn
    6.0457126₦9.68bn₦9.19bn

    Not published for this cube: Median IRR, Median payback.