    Rooftop solar in Nganzai, Borno: what the roofs are worth

    Nganzai has 32,260 buildings with a viable rooftop and 116k kWp of roof capacity. 62% run a generator, and together they spend ₦7.34bn a year on energy.

    Viable buildings

    32,260

    Usable roof area

    531k m²

    116k kWp roof capacity

    Energy spend

    ₦7.34bn/yr

    6.7m kWh/yr burned on generators

    Median payback

    2.4 yr

    Median IRR 47% (cash saved)

    The savings bracket for Nganzai

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦7.34bn/yr
    Year-one cash saved₦6.04bn
    Lifetime cash saved₦256bn
    NPV₦41.8bn
    Median IRR47%
    Median payback2.4 yr
    Unlocked energy5.5m kWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity28.4k kWp
    Capex₦27.3bn
    Year-one energy value₦31.1bn
    Lifetime energy value₦1.4tn
    NPV₦247bn
    Median IRR117%
    Median payback0.9 yr

    Three ways to size Nganzai's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    28.4k kWp
    Capital cost
    ₦27.3bn
    Year 1 savings
    ₦31.1bn/yr
    NPV
    ₦247bn
    Median IRR
    117%
    Median payback
    0.9 yr

    How many rooftops in Nganzai actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. 32,260 of 32,260 clear a positive NPV.

    Payback

    Under 3 years18,427 (57%)
    Under 5 years20,744 (64%)
    Under 7 years32,260 (100%)
    Under 10 years32,260 (100%)

    Return (IRR)

    Above 10%32,260 (100%)
    Above 15%32,260 (100%)
    Above 20%32,260 (100%)
    Above 25%19,910 (62%)
    CO₂ avoided

    11.3m kg/yr

    Fuel avoided

    3.09m L/yr

    Energy unlocked

    5.5m kWh/yr

    Demand that is suppressed today

    People served

    93.3k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Nganzai.

    Solar panels

    250

    ₦/W

    Inverters

    127,419

    ₦/kVA

    Batteries

    177,500

    ₦/kWh

    Building mix in Nganzai

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential29,87118,475₦5.65bn₦4.37bn49%2.1 yr
    Worship1,2611,258₦65.5m₦65.5m47%2.1 yr
    Commercial Retail897113₦26.7m₦26.7m25%4.1 yr
    Commercial General14233₦130m₦130m25%4.1 yr
    Anchor8363₦1.46bn₦1.44bn53%1.9 yr
    Industrial65₦6.65m₦6.65m49%1.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m226,96316,966₦417m₦352m49%2.1 yr
    30 50m22,8361,639₦554m₦431m27%3.9 yr
    50 100m21,727881₦1.63bn₦1.52bn23%4.6 yr
    100 250m2610372₦1.73bn₦1.39bn51%2.1 yr
    250 1000m210072₦1.49bn₦860m55%1.9 yr
    Over 1000m22417₦1.51bn₦1.49bn57%1.9 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Unclassified14,18113,973₦5.32bn₦4.11bn61%1.9 yr
    Dense Urban12,8662,334₦409m₦409m21%5.4 yr
    Urban2,8381,265₦314m₦313m21%5.4 yr
    Rural2,3752,375₦1.3bn₦1.21bn63%1.6 yr

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard32,05919,870₦5.83bn₦4.55bn47%2.1 yr
    SME High11511₦43.1m₦43.1m25%4.1 yr
    Enterprise8666₦1.47bn₦1.45bn53%1.9 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    0.023,25316,530₦233m₦233m
    2.04,4191,320₦1.65bn₦1.43bn
    1.02,1741,176₦742m₦647m
    3.01,899762₦4.62bn₦3.63bn
    4.0460159₦69.4m₦69.4m
    5.0540₦22.5m₦22.5m
    6.010₦2.47m₦2.47m

    Nearby LGAs in Borno

    How these numbers are produced

    Approach A — energy value (upper bracket)

    Sizes the system to the building's full latent demand and values that energy at the mixed grid/generator tariff. It answers what the energy is worth — not what anyone currently pays.

    Approach B — cash saved (lower bracket)

    Sizes the system to demand that is actually served today, values it by merit order (solar displaces generator kWh first) and caps it at current spend. It answers what a building stops paying.

    Cohort: Viable rooftops (≥0.6 kWp potential).

    • Demand is modelled latent demand, not metered consumption.
    • Fuel is priced at ₦1,800/litre (operator-set). NBS reported ₦3,277/litre for May 2026 — on that basis every naira figure here is roughly 1.8× understated.
    • Generator ownership is a model output, not a survey result: it follows from the grid-availability scale and the 25% demand-suppression assumption.
    • Approach A prices energy nobody currently buys. Its savings must never be read as cash saved.
    • Demand is MODELLED LATENT demand, not metered consumption.
    • Generator ownership is model output, not survey.
    • Medians do not combine across groups — re-derive from the histograms.
    • Per-building files are float32 with 4 significant figures; cast to float64 before summing, because polars keeps Float32 sums in Float32.
    • Null scenario fields mean the roof cannot host 0.6 kWp, not zero savings.
    • `genset` was previously named `diesel` and now uses the segment's real fuel.
    • Ordering holds by construction: grid savings < mixed < genset.