Borno State
Rooftop solar in Guzamala, Borno: what the roofs are worth
Guzamala has 26,136 buildings with a viable rooftop and 85.4 MWp of roof capacity. 10% run a generator, and together they spend ₦2.36bn a year on energy.
26,136
396,150 m²
85.4 MWp roof capacity
₦2.36bn/yr
1.94 GWh/yr burned on generators
16.9 yr
Median IRR 5% (cash saved)
The savings bracket for Guzamala
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Guzamala's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 13.1 MWp
- Capital cost
- ₦14.5bn
- Year 1 savings
- ₦17.1bn/yr
- NPV
- ₦140bn
- Median IRR
- 103%
- Median payback
- 1.1 yr
The odds a rooftop in Guzamala pays back quickly
Of the 26,129 buildings in Guzamala with a modelled payback, 17.5% pay back inside five years and 10.5% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Guzamala's demand actually gets met
Buildings in Guzamala consume 3.66 GWh/yr but want 5.75 GWh/yr. The 36% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Guzamala
Loading band economics…
How many rooftops in Guzamala actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 26,129 buildings with a modelled result out of 26,136 in Guzamala. 5,317 clear a positive NPV.
Payback
Return (IRR)
4.45 kt/yr
1.2 million litres/yr
2.09 GWh/yr
Demand that is suppressed today
74.1k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Guzamala.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Guzamala
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| E | 12,386 | 1,831 | ₦1.43bn | ₦1.39bn | 5% | 16.4 yr |
| D | 11,375 | 782 | ₦852m | ₦851m | 5% | 17.1 yr |
| C | 2,375 | 127 | ₦71.9m | ₦71.9m | 5% | 17.4 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 24,320 | 1,652 | ₦2.08bn | ₦2.04bn | 5% | 17.1 yr |
| Worship | 1,696 | 971 | ₦68.5m | ₦68.5m | 43% | 2.4 yr |
| Anchor | 68 | 66 | ₦97.3m | ₦97.3m | 63% | 1.6 yr |
| Commercial General | 43 | 42 | ₦94.2m | ₦94.2m | 65% | 1.6 yr |
| Commercial Retail | 6 | 6 | ₦8.55m | ₦8.55m | 71% | 1.4 yr |
| Industrial | 2 | 2 | ₦8.66m | ₦8.66m | 71% | 1.1 yr |
| Hospitality | 1 | 1 | ₦91k | ₦91k | 61% | 1.6 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 21,619 | 1,566 | ₦217m | ₦216m | 5% | 17.4 yr |
| 30 50m2 | 2,685 | 548 | ₦234m | ₦234m | 11% | 9.4 yr |
| 50 100m2 | 1,464 | 440 | ₦464m | ₦464m | 31% | 3.4 yr |
| 100 250m2 | 335 | 168 | ₦962m | ₦920m | 53% | 2.1 yr |
| 250 1000m2 | 33 | 18 | ₦480m | ₦480m | 69% | 1.6 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Unclassified | 20,010 | 1,013 | ₦1.21bn | ₦1.16bn | 5% | 17.4 yr |
| Rural | 3,445 | 492 | ₦545m | ₦545m | 5% | 15.9 yr |
| Dense Urban | 2,630 | 1,235 | ₦604m | ₦604m | 31% | 3.4 yr |
| Urban | 51 | 0 | ₦1.88m | ₦1.88m | 9% | 9.6 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 21,113 | 591 | ₦85m | ₦85m | 5% | 17.4 yr |
| Residential Small | 2,339 | 791 | ₦636m | ₦636m | 31% | 3.4 yr |
| Residential | 868 | 270 | ₦1.36bn | ₦1.31bn | 31% | 3.4 yr |
| Worship Center | 601 | 338 | ₦14.8m | ₦14.8m | 41% | 2.6 yr |
| Institutional | 595 | 352 | ₦118m | ₦118m | 51% | 2.1 yr |
| Place Of Worship | 530 | 310 | ₦14.4m | ₦14.4m | 41% | 2.6 yr |
| Educational Facility | 18 | 17 | ₦35.7m | ₦35.7m | 95% | 1.1 yr |
| School | 15 | 14 | ₦8.45m | ₦8.45m | 93% | 1.1 yr |
| Clinic | 13 | 13 | ₦20.8m | ₦20.8m | 61% | 1.6 yr |
| Healthcare Facility | 12 | 12 | ₦22.5m | ₦22.5m | 61% | 1.6 yr |
| Hospital | 10 | 10 | ₦9.81m | ₦9.81m | 61% | 1.6 yr |
| Commercial | 8 | 8 | ₦13.3m | ₦13.3m | 73% | 1.4 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 26,012 | 2,702 | ₦2.34bn | ₦2.3bn |
| Farmland | 86 | 0 | ₦976k | ₦976k |
| Retail | 38 | 38 | ₦16.4m | ₦16.4m |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 26,059 | 2,665 | ₦2.23bn | ₦2.19bn | 5% | 16.9 yr |
| Enterprise | 69 | 67 | ₦106m | ₦106m | 63% | 1.6 yr |
| SME High | 8 | 8 | ₦19.9m | ₦19.9m | 73% | 1.4 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 21,968 | 1,054 | ₦102m | ₦102m |
| 2.0 | 1,760 | 643 | ₦733m | ₦733m |
| 1.0 | 1,658 | 666 | ₦224m | ₦222m |
| 3.0 | 750 | 377 | ₦1.3bn | ₦1.26bn |
Not published for this cube: Median IRR, Median payback.