Adamawa State
Rooftop solar in Madagali, Adamawa: what the roofs are worth
Madagali has 72,417 buildings with a viable rooftop and 482 MWp of roof capacity. 17% run a generator, and together they spend ₦12.2bn a year on energy.
72,417
2.18 km²
482 MWp roof capacity
₦12.2bn/yr
11.5 GWh/yr burned on generators
9.1 yr
Median IRR 11% (cash saved)
The savings bracket for Madagali
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Madagali's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 71.4 MWp
- Capital cost
- ₦74.7bn
- Year 1 savings
- ₦80.6bn/yr
- NPV
- ₦660bn
- Median IRR
- 105%
- Median payback
- 0.9 yr
The odds a rooftop in Madagali pays back quickly
Of the 71,470 buildings in Madagali with a modelled payback, 36.9% pay back inside five years and 17.9% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Madagali's demand actually gets met
Buildings in Madagali consume 20.9 GWh/yr but want 34.1 GWh/yr. The 39% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Madagali
Loading band economics…
How many rooftops in Madagali actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 71,470 buildings with a modelled result out of 72,417 in Madagali. 30,779 clear a positive NPV.
Payback
Return (IRR)
23.5 kt/yr
5.7 million litres/yr
13.1 GWh/yr
Demand that is suppressed today
254k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Madagali.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Madagali
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| D | 23,894 | 4,935 | ₦5.13bn | ₦5.04bn | 9% | 12.9 yr |
| E | 23,162 | 4,358 | ₦4.6bn | ₦4.6bn | 9% | 12.9 yr |
| C | 20,634 | 3,163 | ₦2.27bn | ₦2.24bn | 11% | 7.9 yr |
| B | 4,727 | 31 | ₦235m | ₦235m | 21% | 5.1 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 64,122 | 4,833 | ₦7.84bn | ₦7.72bn | 9% | 9.9 yr |
| Commercial Retail | 5,976 | 5,515 | ₦617m | ₦617m | 61% | 1.6 yr |
| Commercial General | 1,822 | 1,672 | ₦2bn | ₦2bn | 65% | 1.6 yr |
| Anchor | 266 | 243 | ₦1.59bn | ₦1.59bn | 71% | 1.4 yr |
| Worship | 209 | 206 | ₦152m | ₦152m | 63% | 1.6 yr |
| Industrial | 22 | 18 | ₦31.2m | ₦31.2m | 73% | 1.4 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Under 30m2 | 37,217 | 5,655 | ₦530m | ₦529m | 7% | 15.4 yr |
| 30 50m2 | 18,580 | 3,012 | ₦874m | ₦857m | 11% | 8.9 yr |
| 50 100m2 | 12,340 | 2,452 | ₦2.31bn | ₦2.22bn | 31% | 3.6 yr |
| 100 250m2 | 3,611 | 1,068 | ₦3.49bn | ₦3.49bn | 31% | 3.4 yr |
| 250 1000m2 | 627 | 275 | ₦3.52bn | ₦3.51bn | 33% | 3.4 yr |
| Over 1000m2 | 42 | 25 | ₦1.5bn | ₦1.5bn | 59% | 1.6 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Dense Urban | 27,466 | 4,096 | ₦2.03bn | ₦2.03bn | 15% | 6.6 yr |
| Unclassified | 17,530 | 2,339 | ₦4.37bn | ₦4.27bn | 7% | 14.4 yr |
| Urban | 17,516 | 4,473 | ₦4.45bn | ₦4.43bn | 11% | 9.1 yr |
| Rural | 9,905 | 1,579 | ₦1.38bn | ₦1.38bn | 9% | 13.4 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Shed | 40,537 | 2,562 | ₦247m | ₦247m | 7% | 14.9 yr |
| Residential Small | 14,232 | 1,190 | ₦2.11bn | ₦2.01bn | 31% | 3.6 yr |
| Kiosk Shop | 5,976 | 5,515 | ₦617m | ₦617m | 61% | 1.6 yr |
| Residential | 5,346 | 1,081 | ₦5.47bn | ₦5.45bn | 31% | 3.6 yr |
| Residential Formal | 2,659 | 0 | ₦9.58m | ₦9.58m | 7% | 9.4 yr |
| Commercial | 1,349 | 1,223 | ₦1.52bn | ₦1.52bn | 65% | 1.6 yr |
| Residential Informal | 1,348 | 0 | ₦9.98m | ₦9.98m | 13% | 7.1 yr |
| Institutional | 235 | 219 | ₦1.41bn | ₦1.41bn | 61% | 1.9 yr |
| Commercial Corridor | 183 | 180 | ₦151m | ₦151m | 65% | 1.6 yr |
| Market | 146 | 142 | ₦33.6m | ₦33.6m | 71% | 1.4 yr |
| Educational Facility | 86 | 79 | ₦149m | ₦149m | 93% | 1.1 yr |
| Worship Center | 65 | 63 | ₦24.6m | ₦24.6m | 67% | 1.6 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 72,213 | 12,461 | ₦11.9bn | ₦11.8bn |
| Farmland | 133 | 5 | ₦471k | ₦471k |
| Industrial | 50 | 0 | ₦483k | ₦483k |
| Commercial | 21 | 21 | ₦303m | ₦303m |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 70,602 | 10,828 | ₦8.95bn | ₦8.84bn | 9% | 9.4 yr |
| SME High | 1,532 | 1,403 | ₦1.67bn | ₦1.67bn | 65% | 1.6 yr |
| Enterprise | 283 | 256 | ₦1.61bn | ₦1.61bn | 71% | 1.4 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 0.0 | 40,744 | 2,750 | ₦256m | ₦256m |
| 1.0 | 11,525 | 6,283 | ₦1.57bn | ₦1.49bn |
| 2.0 | 10,269 | 1,518 | ₦2.59bn | ₦2.56bn |
| 3.0 | 7,798 | 1,849 | ₦7.25bn | ₦7.24bn |
| 4.0 | 2,073 | 79 | ₦528m | ₦528m |
| 5.0 | 8 | 8 | ₦39.8m | ₦39.8m |
Not published for this cube: Median IRR, Median payback.

