    Rooftop solar in Atakunmosa East, Osun: what the roofs are worth

    Atakunmosa East has 13,837 buildings with a viable rooftop and 245 MWp of roof capacity. 9% run a generator, and together they spend ₦3.3bn a year on energy.

    Viable buildings

    13,837

    Usable roof area

    1.09 km²

    245 MWp roof capacity

    Energy spend

    ₦3.3bn/yr

    3.54 GWh/yr burned on generators

    Median payback

    5.9 yr

    Median IRR 19% (cash saved)

    The savings bracket for Atakunmosa East

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦3.3bn/yr
    Year-one cash saved₦3.29bn
    Lifetime cash saved₦176bn
    NPV₦26.4bn
    Median IRR19%
    Median payback5.9 yr
    Unlocked energy3.48 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity21.1 MWp
    Capex₦21.3bn
    Year-one energy value₦18.2bn
    Lifetime energy value₦865bn
    NPV₦145bn
    Median IRR97%
    Median payback1.1 yr

    Three ways to size Atakunmosa East's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    21.1 MWp
    Capital cost
    ₦21.3bn
    Year 1 savings
    ₦18.2bn/yr
    NPV
    ₦145bn
    Median IRR
    97%
    Median payback
    1.1 yr

    The odds a rooftop in Atakunmosa East pays back quickly

    Of the 13,401 buildings in Atakunmosa East with a modelled payback, 40.8% pay back inside five years and 9.7% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Atakunmosa East's demand actually gets met

    Buildings in Atakunmosa East consume 5.79 GWh/yr but want 9.27 GWh/yr. The 38% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Atakunmosa East

    Loading band economics…

    How many rooftops in Atakunmosa East actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 13,401 buildings with a modelled result out of 13,837 in Atakunmosa East. 8,241 clear a positive NPV.

    Payback

    Under 3 years1,303 (10%)
    Under 5 years5,472 (41%)
    Under 7 years8,218 (61%)
    Under 10 years10,274 (77%)

    Return (IRR)

    Above 10%9,938 (72%)
    Above 15%8,241 (60%)
    Above 20%6,214 (45%)
    Above 25%2,479 (18%)
    CO₂ avoided

    6.08 kt/yr

    Fuel avoided

    1.45 million litres/yr

    Energy unlocked

    3.48 GWh/yr

    Demand that is suppressed today

    People served

    52.5k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Atakunmosa East.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Atakunmosa East

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    E9,134953₦2.05bn₦2.03bn17%6.1 yr
    D3,619286₦1.15bn₦1.15bn21%5.1 yr
    C1,05148₦106m₦106m19%5.6 yr
    B290₦2.58m₦2.58m25%4.4 yr
    A40₦4.24k₦4.24k-1%17.9 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential13,357953₦1.46bn₦1.46bn17%5.9 yr
    Anchor204151₦1.33bn₦1.31bn53%2.1 yr
    Commercial General177122₦333m₦333m53%1.9 yr
    Industrial9154₦154m₦154m55%1.9 yr
    Filling Station65₦11.7m₦11.7m49%2.1 yr
    Worship22₦7.95m₦7.95m39%1.9 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    100 250m24,685560₦1.13bn₦1.12bn25%4.6 yr
    50 100m24,565243₦198m₦198m19%5.6 yr
    Under 30m22,133159₦27.3m₦27.3m5%15.1 yr
    30 50m21,956144₦56.6m₦56.6m9%12.6 yr
    250 1000m2484173₦1.24bn₦1.22bn25%4.4 yr
    Over 1000m2148₦658m₦658m59%1.9 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Unclassified6,387360₦884m₦884m19%5.6 yr
    Rural4,305409₦700m₦700m13%7.4 yr
    Dense Urban2,449466₦1.6bn₦1.59bn21%4.9 yr
    Urban69652₦115m₦115m23%4.6 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential Small5,971382₦203m₦203m17%6.1 yr
    Residential4,083427₦1.21bn₦1.21bn25%4.4 yr
    Shed2,462134₦30.4m₦30.4m7%14.4 yr
    Residential Formal6550₦7.47m₦7.47m13%6.9 yr
    Institutional181124₦899m₦899m53%1.9 yr
    Apartment730₦667k₦667k17%6.1 yr
    Duplex630₦753k₦753k11%9.1 yr
    Industrial Site6135₦111m₦111m61%1.6 yr
    Educational Facility6048₦227m₦227m79%1.4 yr
    Healthcare Facility4835₦315m₦312m49%2.1 yr
    Clinic4131₦149m₦135m49%2.1 yr
    School4029₦53.9m₦53.9m77%1.4 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)13,8371,287₦3.3bn₦3.29bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard13,5351,077₦1.81bn₦1.81bn19%5.9 yr
    Enterprise295205₦1.49bn₦1.47bn53%1.9 yr
    SME High75₦11.7m₦11.7m49%2.1 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    3.06,321831₦2.93bn₦2.91bn
    2.03,429264₦231m₦231m
    0.02,407119₦23.1m₦23.1m
    1.089963₦30.8m₦30.8m
    4.07799₦67.9m₦67.9m
    5.021₦21.8m₦21.8m

    Not published for this cube: Median IRR, Median payback.