    Rooftop solar in Ogori/Magongo, Kogi: what the roofs are worth

    Ogori/Magongo has 5,648 buildings with a viable rooftop and 139k kWp of roof capacity. 88% run a generator, and together they spend ₦7.18bn a year on energy.

    Viable buildings

    5,648

    Usable roof area

    619k m²

    139k kWp roof capacity

    Energy spend

    ₦7.18bn/yr

    6.31m kWh/yr burned on generators

    Median payback

    1.6 yr

    Median IRR 61% (cash saved)

    The savings bracket for Ogori/Magongo

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦7.18bn/yr
    Year-one cash saved₦7.09bn
    Lifetime cash saved₦300bn
    NPV₦48.3bn
    Median IRR61%
    Median payback1.6 yr
    Unlocked energy6.2m kWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity35.4k kWp
    Capex₦34.3bn
    Year-one energy value₦35.4bn
    Lifetime energy value₦1.66tn
    NPV₦287bn
    Median IRR119%
    Median payback0.9 yr

    Three ways to size Ogori/Magongo's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    35.4k kWp
    Capital cost
    ₦34.3bn
    Year 1 savings
    ₦35.4bn/yr
    NPV
    ₦287bn
    Median IRR
    119%
    Median payback
    0.9 yr

    How many rooftops in Ogori/Magongo actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. 5,648 of 5,648 clear a positive NPV.

    Payback

    Under 3 years4,426 (78%)
    Under 5 years4,887 (87%)
    Under 7 years5,648 (100%)
    Under 10 years5,648 (100%)

    Return (IRR)

    Above 10%5,648 (100%)
    Above 15%5,648 (100%)
    Above 20%4,953 (88%)
    Above 25%4,757 (84%)
    CO₂ avoided

    13.3m kg/yr

    Fuel avoided

    4.06m L/yr

    Energy unlocked

    6.2m kWh/yr

    Demand that is suppressed today

    People served

    57.1k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Ogori/Magongo.

    Solar panels

    250

    ₦/W

    Inverters

    127,419

    ₦/kVA

    Batteries

    177,500

    ₦/kWh

    Building mix in Ogori/Magongo

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential5,5054,859₦6.48bn₦6.4bn61%1.6 yr
    Anchor7270₦411m₦411m53%1.9 yr
    Commercial General4746₦236m₦236m49%2.1 yr
    Worship2115₦41.8m₦41.8m49%2.1 yr
    Industrial22₦3.25m₦3.25m67%1.6 yr
    Commercial Retail11₦9.54k₦9.54k33%3.4 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    100 250m22,1981,931₦2.68bn₦2.61bn63%1.6 yr
    Under 30m21,2051,092₦45.5m₦45.5m57%1.9 yr
    50 100m2948803₦296m₦291m61%1.9 yr
    250 1000m2744693₦3.92bn₦3.91bn67%1.6 yr
    30 50m2546467₦36.1m₦36.1m59%1.9 yr
    Over 1000m277₦206m₦206m71%1.4 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Dense Urban4,4213,869₦4.45bn₦4.44bn65%1.6 yr
    Unclassified825763₦1.28bn₦1.27bn53%2.1 yr
    Urban402361₦1.45bn₦1.38bn63%1.6 yr

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard5,5754,922₦6.76bn₦6.68bn61%1.6 yr
    Enterprise7371₦414m₦414m59%1.9 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    3.02,5822,241₦6.24bn₦6.16bn
    0.01,5131,430₦63.1m₦63.1m
    2.01,2331,042₦797m₦797m
    1.0320280₦77.4m₦77.1m

    Nearby LGAs in Kogi

    How these numbers are produced

    Approach A — energy value (upper bracket)

    Sizes the system to the building's full latent demand and values that energy at the mixed grid/generator tariff. It answers what the energy is worth — not what anyone currently pays.

    Approach B — cash saved (lower bracket)

    Sizes the system to demand that is actually served today, values it by merit order (solar displaces generator kWh first) and caps it at current spend. It answers what a building stops paying.

    Cohort: Viable rooftops (≥0.6 kWp potential).

    • Demand is modelled latent demand, not metered consumption.
    • Fuel is priced at ₦1,800/litre (operator-set). NBS reported ₦3,277/litre for May 2026 — on that basis every naira figure here is roughly 1.8× understated.
    • Generator ownership is a model output, not a survey result: it follows from the grid-availability scale and the 25% demand-suppression assumption.
    • Approach A prices energy nobody currently buys. Its savings must never be read as cash saved.
    • Demand is MODELLED LATENT demand, not metered consumption.
    • Generator ownership is model output, not survey.
    • Medians do not combine across groups — re-derive from the histograms.
    • Per-building files are float32 with 4 significant figures; cast to float64 before summing, because polars keeps Float32 sums in Float32.
    • Null scenario fields mean the roof cannot host 0.6 kWp, not zero savings.
    • `genset` was previously named `diesel` and now uses the segment's real fuel.
    • Ordering holds by construction: grid savings < mixed < genset.