PureWatts AI

    Solar energy assistant

    📍 Home

    Hi there! 👋

    I'm your PureWatts AI assistant. Ask me anything about solar energy, system sizing, or how to use the platform.

    Skip to content

    Jigawa State

    Rooftop solar in Birnin Kudu, Jigawa: what the roofs are worth

    Birnin Kudu has 201,330 buildings with a viable rooftop and 1 GWp of roof capacity. 1% run a generator, and together they spend ₦13.3bn a year on energy.

    Viable buildings

    201,330

    Usable roof area

    4.58 km²

    1 GWp roof capacity

    Energy spend

    ₦13.3bn/yr

    11 GWh/yr burned on generators

    Median payback

    13.1 yr

    Median IRR 9% (cash saved)

    The savings bracket for Birnin Kudu

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦13.3bn/yr
    Year-one cash saved₦13.2bn
    Lifetime cash saved₦737bn
    NPV₦101bn
    Median IRR9%
    Median payback13.1 yr
    Unlocked energy13.6 GWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity106 MWp
    Capex₦115bn
    Year-one energy value₦122bn
    Lifetime energy value₦5.77tn
    NPV₦995bn
    Median IRR103%
    Median payback1.1 yr

    Three ways to size Birnin Kudu's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    106 MWp
    Capital cost
    ₦115bn
    Year 1 savings
    ₦122bn/yr
    NPV
    ₦995bn
    Median IRR
    103%
    Median payback
    1.1 yr

    The odds a rooftop in Birnin Kudu pays back quickly

    Of the 200,432 buildings in Birnin Kudu with a modelled payback, 22.4% pay back inside five years and 2.2% inside three.

    Sign up to see the full breakdown

    Create a free account

    How much of Birnin Kudu's demand actually gets met

    Buildings in Birnin Kudu consume 30.1 GWh/yr but want 43.7 GWh/yr. The 31% they cannot buy is suppressed demand — load that appears the moment supply is reliable.

    Sign up to see the full breakdown

    Create a free account

    Electricity billing bands in Birnin Kudu

    Loading band economics…

    How many rooftops in Birnin Kudu actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 200,432 buildings with a modelled result out of 201,330 in Birnin Kudu. 67,220 clear a positive NPV.

    Payback

    Under 3 years4,339 (2%)
    Under 5 years44,831 (22%)
    Under 7 years67,475 (34%)
    Under 10 years98,602 (49%)

    Return (IRR)

    Above 10%88,293 (44%)
    Above 15%67,220 (33%)
    Above 20%50,563 (25%)
    Above 25%36,288 (18%)
    CO₂ avoided

    26.3 kt/yr

    Fuel avoided

    4.99 million litres/yr

    Energy unlocked

    13.6 GWh/yr

    Demand that is suppressed today

    People served

    448k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Birnin Kudu.

    Solar panels

    ₦250

    ₦/W

    Inverters

    ₦127,419

    ₦/kVA

    Batteries

    ₦177,500

    ₦/kWh

    Building mix in Birnin Kudu

    Electricity billing band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    C59,453502₦1.7bn₦1.7bn9%9.9 yr
    D51,834569₦818m₦818m7%14.9 yr
    E49,810330₦950m₦934m7%14.9 yr
    A21,136843₦3.39bn₦3.38bn21%5.1 yr
    B19,097710₦6.42bn₦6.41bn19%5.6 yr

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential197,1281,546₦8bn₦7.97bn9%13.1 yr
    Commercial Retail2,605273₦101m₦101m35%2.9 yr
    Commercial General749400₦668m₦668m47%2.4 yr
    Anchor350274₦4.34bn₦4.34bn71%1.4 yr
    Productive Use250242₦48m₦48m67%1.6 yr
    Worship201181₦44.8m₦44.8m65%1.6 yr
    Industrial1913₦66.5m₦66.5m59%1.9 yr
    Hospitality1716₦8.52m₦8.52m69%1.6 yr
    Filling Station119₦3.57m₦3.57m69%1.6 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m2121,467924₦446m₦446m5%15.9 yr
    30 50m251,022650₦810m₦810m11%8.4 yr
    50 100m223,250547₦1.53bn₦1.53bn31%3.6 yr
    100 250m24,828581₦2.32bn₦2.29bn31%3.4 yr
    250 1000m2718222₦3.31bn₦3.31bn33%3.4 yr
    Over 1000m24530₦4.86bn₦4.86bn71%1.6 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Urban91,150846₦2.53bn₦2.5bn9%13.1 yr
    Unclassified39,335248₦3.58bn₦3.58bn5%17.1 yr
    Rural37,927314₦594m₦594m9%13.4 yr
    Urban Centre21,3851,298₦6.21bn₦6.21bn21%5.1 yr
    Dense Urban11,533248₦362m₦362m19%5.6 yr

    Building type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Shed135,325468₦391m₦391m7%15.1 yr
    Residential Small29,575542₦1.95bn₦1.94bn31%3.6 yr
    Residential14,544443₦5.27bn₦5.24bn17%6.1 yr
    Residential Formal11,5640₦116m₦116m21%5.4 yr
    Residential Informal6,11393₦276m₦276m21%4.9 yr
    Kiosk Shop2,826486₦137m₦137m37%2.9 yr
    Commercial25878₦185m₦185m37%2.9 yr
    Institutional239190₦4.07bn₦4.07bn57%1.9 yr
    Market201197₦35.4m₦35.4m67%1.6 yr
    Educational Facility12898₦188m₦188m83%1.4 yr
    School12293₦45m₦45m83%1.4 yr
    Commercial Corridor1066₦171m₦171m37%2.9 yr

    Land use

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    (Unset)201,3302,954₦13.3bn₦13.2bn

    Not published for this cube: Median IRR, Median payback.

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard200,6112,600₦8.52bn₦8.5bn9%13.1 yr
    SME High36679₦359m₦359m37%2.9 yr
    Enterprise353275₦4.39bn₦4.39bn73%1.4 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B)
    0.0135,528632₦411m₦411m
    2.027,230563₦1.6bn₦1.58bn
    1.014,559768₦783m₦782m
    3.013,122950₦9.81bn₦9.8bn
    4.010,84638₦427m₦427m
    5.0413₦240m₦240m
    6.040₦7.37m₦7.37m

    Not published for this cube: Median IRR, Median payback.

    Nearby LGAs in Jigawa