    Rooftop solar in Geidam, Yobe: what the roofs are worth

    Geidam has 102,266 buildings with a viable rooftop and 463k kWp of roof capacity. 73% run a generator, and together they spend ₦12bn a year on energy.

    Viable buildings

    102,266

    Usable roof area

    2.11m m²

    463k kWp roof capacity

    Energy spend

    ₦12bn/yr

    10.3m kWh/yr burned on generators

    Median payback

    1.9 yr

    Median IRR 57% (cash saved)

    The savings bracket for Geidam

    Approach B

    Cash saved

    What these buildings stop paying — merit order, capped at current spend.

    Current energy spend₦12bn/yr
    Year-one cash saved₦12bn
    Lifetime cash saved₦514bn
    NPV₦82.8bn
    Median IRR57%
    Median payback1.9 yr
    Unlocked energy11.7m kWh/yr
    Approach A

    Energy value (upper bracket)

    What the energy is worth if full latent demand were met. Not cash saved.

    Installed capacity70.3k kWp
    Capex₦67.8bn
    Year-one energy value₦78.4bn
    Lifetime energy value₦3.62tn
    NPV₦636bn
    Median IRR141%
    Median payback0.6 yr

    Three ways to size Geidam's rooftops

    Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.

    Baseline: mixed
    Counterfactual: grid when available, generator otherwise, weighted by the NTL-derived grid availability. The realistic case, and what the headline numbers use. Always falls between grid and genset by construction.

    Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.

    System size
    70.3k kWp
    Capital cost
    ₦67.8bn
    Year 1 savings
    ₦78.4bn/yr
    NPV
    ₦636bn
    Median IRR
    141%
    Median payback
    0.6 yr

    How many rooftops in Geidam actually pay

    Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. 102,266 of 102,266 clear a positive NPV.

    Payback

    Under 3 years72,869 (71%)
    Under 5 years75,677 (74%)
    Under 7 years102,266 (100%)
    Under 10 years102,266 (100%)

    Return (IRR)

    Above 10%102,266 (100%)
    Above 15%102,266 (100%)
    Above 20%102,266 (100%)
    Above 25%75,073 (73%)
    CO₂ avoided

    23.2m kg/yr

    Fuel avoided

    6.13m L/yr

    Energy unlocked

    11.7m kWh/yr

    Demand that is suppressed today

    People served

    189k

    What hardware costs right now

    Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Geidam.

    Solar panels

    250

    ₦/W

    Inverters

    127,419

    ₦/kVA

    Batteries

    177,500

    ₦/kWh

    Building mix in Geidam

    Load profile

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Residential100,91174,475₦9.57bn₦9.54bn57%1.9 yr
    Commercial Retail68084₦24m₦24m25%4.1 yr
    Commercial General49563₦250m₦250m25%4.1 yr
    Anchor143107₦1.33bn₦1.33bn47%2.4 yr
    Industrial2222₦843m₦843m67%1.6 yr
    Worship88₦309k₦309k41%2.1 yr
    Hospitality66₦3.46m₦3.46m55%1.9 yr
    Mall Retail10₦36.5k₦36.5k25%4.1 yr

    Roof size band

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Under 30m273,86061,456₦986m₦986m59%1.9 yr
    30 50m214,4178,068₦1.61bn₦1.59bn43%2.6 yr
    50 100m210,8043,971₦3.13bn₦3.13bn21%5.4 yr
    100 250m22,7751,040₦2.27bn₦2.27bn21%5.4 yr
    250 1000m2394219₦2.55bn₦2.55bn47%2.1 yr
    Over 1000m21611₦1.48bn₦1.47bn63%1.6 yr

    Settlement type

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Unclassified61,95661,559₦5.66bn₦5.63bn63%1.6 yr
    Urban Centre30,3454,986₦3.66bn₦3.66bn21%5.4 yr
    Rural6,8916,038₦940m₦935m67%1.6 yr
    Urban3,0742,182₦1.77bn₦1.77bn69%1.6 yr

    Lead segment

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    Standard101,66674,620₦9.7bn₦9.68bn57%1.9 yr
    SME High43616₦145m₦145m25%4.1 yr
    Enterprise164129₦2.18bn₦2.17bn51%2.1 yr

    Demand tier

    SegmentBuildings With generator Spend ₦/yr Cash saved yr 1 (B) Median IRR Median payback
    0.070,84765,380₦945m₦945m
    4.010,89853₦1.33bn₦1.33bn
    2.07,8924,326₦3.16bn₦3.15bn
    3.07,6162,282₦4.49bn₦4.48bn
    1.04,8022,722₦1.64bn₦1.62bn
    5.01971₦73.4m₦73.4m
    6.0141₦400m₦400m

    Nearby LGAs in Yobe

    How these numbers are produced

    Approach A — energy value (upper bracket)

    Sizes the system to the building's full latent demand and values that energy at the mixed grid/generator tariff. It answers what the energy is worth — not what anyone currently pays.

    Approach B — cash saved (lower bracket)

    Sizes the system to demand that is actually served today, values it by merit order (solar displaces generator kWh first) and caps it at current spend. It answers what a building stops paying.

    Cohort: Viable rooftops (≥0.6 kWp potential).

    • Demand is modelled latent demand, not metered consumption.
    • Fuel is priced at ₦1,800/litre (operator-set). NBS reported ₦3,277/litre for May 2026 — on that basis every naira figure here is roughly 1.8× understated.
    • Generator ownership is a model output, not a survey result: it follows from the grid-availability scale and the 25% demand-suppression assumption.
    • Approach A prices energy nobody currently buys. Its savings must never be read as cash saved.
    • Demand is MODELLED LATENT demand, not metered consumption.
    • Generator ownership is model output, not survey.
    • Medians do not combine across groups — re-derive from the histograms.
    • Per-building files are float32 with 4 significant figures; cast to float64 before summing, because polars keeps Float32 sums in Float32.
    • Null scenario fields mean the roof cannot host 0.6 kWp, not zero savings.
    • `genset` was previously named `diesel` and now uses the segment's real fuel.
    • Ordering holds by construction: grid savings < mixed < genset.