Imo State
Rooftop solar in Njaba, Imo: what the roofs are worth
Njaba has 35,672 buildings with a viable rooftop and 836 MWp of roof capacity. 48% run a generator, and together they spend ₦15.1bn a year on energy.
35,672
3.72 km²
836 MWp roof capacity
₦15.1bn/yr
13.6 GWh/yr burned on generators
4.4 yr
Median IRR 25% (cash saved)
The savings bracket for Njaba
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Njaba's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 54.3 MWp
- Capital cost
- ₦56.6bn
- Year 1 savings
- ₦47.6bn/yr
- NPV
- ₦378bn
- Median IRR
- 97%
- Median payback
- 1.1 yr
The odds a rooftop in Njaba pays back quickly
Of the 35,394 buildings in Njaba with a modelled payback, 69.0% pay back inside five years and 45.9% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Njaba's demand actually gets met
Buildings in Njaba consume 21 GWh/yr but want 33.4 GWh/yr. The 37% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Njaba
Loading band economics…
How many rooftops in Njaba actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 35,394 buildings with a modelled result out of 35,672 in Njaba. 28,529 clear a positive NPV.
Payback
Return (IRR)
27.6 kt/yr
8.11 million litres/yr
12.4 GWh/yr
Demand that is suppressed today
108k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Njaba.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Njaba
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| E | 11,196 | 4,728 | ₦3.69bn | ₦3.66bn | 25% | 4.4 yr |
| D | 10,937 | 4,392 | ₦2.91bn | ₦2.91bn | 25% | 4.4 yr |
| C | 8,851 | 4,887 | ₦5.37bn | ₦5.31bn | 45% | 2.4 yr |
| B | 4,688 | 3,151 | ₦3.1bn | ₦3.08bn | 41% | 2.6 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 35,195 | 16,752 | ₦12.2bn | ₦12.2bn | 25% | 4.4 yr |
| Anchor | 200 | 173 | ₦1.5bn | ₦1.42bn | 71% | 1.4 yr |
| Commercial General | 199 | 173 | ₦1.24bn | ₦1.21bn | 59% | 1.9 yr |
| Commercial Retail | 50 | 36 | ₦9.57m | ₦9.57m | 63% | 1.6 yr |
| Worship | 16 | 13 | ₦37.8m | ₦37.8m | 61% | 1.6 yr |
| Industrial | 11 | 10 | ₦54.3m | ₦54.3m | 71% | 1.4 yr |
| Filling Station | 1 | 1 | ₦775k | ₦775k | 65% | 1.6 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| 100 250m2 | 12,958 | 6,110 | ₦5.9bn | ₦5.9bn | 25% | 4.4 yr |
| 50 100m2 | 7,667 | 3,736 | ₦919m | ₦919m | 25% | 4.4 yr |
| Under 30m2 | 6,305 | 3,001 | ₦244m | ₦244m | 19% | 5.4 yr |
| 30 50m2 | 4,570 | 2,192 | ₦270m | ₦270m | 21% | 4.9 yr |
| 250 1000m2 | 4,119 | 2,083 | ₦6.5bn | ₦6.44bn | 29% | 3.6 yr |
| Over 1000m2 | 53 | 36 | ₦1.23bn | ₦1.18bn | 59% | 1.9 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Urban Centre | 34,353 | 16,653 | ₦14.8bn | ₦14.7bn | 25% | 4.4 yr |
| Unclassified | 1,319 | 505 | ₦278m | ₦278m | 23% | 4.6 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 11,826 | 5,787 | ₦9.77bn | ₦9.77bn | 25% | 4.4 yr |
| Residential Small | 11,410 | 5,585 | ₦1.42bn | ₦1.42bn | 25% | 3.6 yr |
| Shed | 7,418 | 3,500 | ₦313m | ₦313m | 19% | 5.6 yr |
| Residential Formal | 2,195 | 1,371 | ₦495m | ₦495m | 31% | 3.6 yr |
| Residential Informal | 1,944 | 292 | ₦146m | ₦146m | 25% | 4.4 yr |
| Apartment | 324 | 152 | ₦59.2m | ₦59.2m | 25% | 4.4 yr |
| Institutional | 119 | 103 | ₦935m | ₦912m | 57% | 1.9 yr |
| Duplex | 75 | 63 | ₦23.3m | ₦23.3m | 45% | 2.4 yr |
| Commercial | 72 | 64 | ₦683m | ₦653m | 65% | 1.6 yr |
| Educational Facility | 67 | 57 | ₦313m | ₦313m | 81% | 1.4 yr |
| School | 64 | 55 | ₦145m | ₦145m | 79% | 1.4 yr |
| Kiosk Shop | 50 | 36 | ₦9.57m | ₦9.57m | 63% | 1.6 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 35,672 | 17,158 | ₦15.1bn | ₦15bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 35,388 | 16,910 | ₦12.8bn | ₦12.8bn | 25% | 4.4 yr |
| Enterprise | 211 | 183 | ₦1.56bn | ₦1.48bn | 71% | 1.4 yr |
| SME High | 73 | 65 | ₦684m | ₦654m | 65% | 1.6 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 3.0 | 20,741 | 10,255 | ₦12.9bn | ₦12.8bn |
| 0.0 | 7,421 | 3,502 | ₦314m | ₦314m |
| 4.0 | 3,991 | 1,747 | ₦1.11bn | ₦1.11bn |
| 2.0 | 3,304 | 1,556 | ₦391m | ₦391m |
| 1.0 | 207 | 92 | ₦14.5m | ₦14.5m |
| 5.0 | 8 | 6 | ₦362m | ₦332m |
Not published for this cube: Median IRR, Median payback.