Enugu State
Rooftop solar in Uzo-Uwani, Enugu: what the roofs are worth
Uzo-Uwani has 35,882 buildings with a viable rooftop and 587 MWp of roof capacity. 33% run a generator, and together they spend ₦29.1bn a year on energy.
35,882
2.62 km²
587 MWp roof capacity
₦29.1bn/yr
26.6 GWh/yr burned on generators
4.4 yr
Median IRR 25% (cash saved)
The savings bracket for Uzo-Uwani
Cash saved
What these buildings stop paying — merit order, capped at current spend.
Energy value (upper bracket)
What the energy is worth if full latent demand were met. Not cash saved.
Three ways to size Uzo-Uwani's rooftops
Solar + battery. The default headline scenario, and the one the SEO fact base quotes. Prices the energy a full solar+storage system would deliver.
Read with care: Sized to LATENT demand — the energy the building would use if it could. Against a cash baseline that only reflects today's spend this looks oversized; that is what sc3 exists to fix.
- System size
- 92.4 MWp
- Capital cost
- ₦96.4bn
- Year 1 savings
- ₦89.9bn/yr
- NPV
- ₦723bn
- Median IRR
- 99%
- Median payback
- 1.1 yr
The odds a rooftop in Uzo-Uwani pays back quickly
Of the 35,564 buildings in Uzo-Uwani with a modelled payback, 61.3% pay back inside five years and 33.4% inside three.
Sign up to see the full breakdown
Create a free accountHow much of Uzo-Uwani's demand actually gets met
Buildings in Uzo-Uwani consume 35.5 GWh/yr but want 54.2 GWh/yr. The 34% they cannot buy is suppressed demand — load that appears the moment supply is reliable.
Sign up to see the full breakdown
Create a free accountElectricity billing bands in Uzo-Uwani
Loading band economics…
How many rooftops in Uzo-Uwani actually pay
Counted building by building on the cash-saved basis (merit-order sized, valued against what the building spends today), not read off an average. Shares are of the 35,564 buildings with a modelled result out of 35,882 in Uzo-Uwani. 25,453 clear a positive NPV.
Payback
Return (IRR)
48.8 kt/yr
15.8 million litres/yr
18.7 GWh/yr
Demand that is suppressed today
244k
What hardware costs right now
Median advertised rates from our Nigerian market tracker — the same prices used to cost a system in Uzo-Uwani.
Solar panels
₦250
₦/W
Inverters
₦127,419
₦/kVA
Batteries
₦177,500
₦/kWh
Building mix in Uzo-Uwani
Electricity billing band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| D | 16,740 | 5,936 | ₦14.7bn | ₦14bn | 25% | 4.4 yr |
| E | 12,612 | 3,939 | ₦10.3bn | ₦9.6bn | 25% | 4.4 yr |
| C | 6,530 | 2,024 | ₦4.11bn | ₦3.97bn | 25% | 4.4 yr |
Load profile
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential | 35,149 | 11,204 | ₦25.2bn | ₦23.8bn | 25% | 4.4 yr |
| Anchor | 325 | 318 | ₦2.15bn | ₦2.1bn | 77% | 1.4 yr |
| Commercial General | 278 | 262 | ₦1.16bn | ₦1.16bn | 57% | 1.9 yr |
| Industrial | 112 | 105 | ₦596m | ₦595m | 71% | 1.4 yr |
| Commercial Retail | 9 | 1 | ₦600k | ₦600k | 23% | 4.9 yr |
| Worship | 6 | 6 | ₦3.99m | ₦3.99m | 63% | 1.6 yr |
| Filling Station | 3 | 3 | ₦5.05m | ₦5.05m | 67% | 1.6 yr |
Roof size band
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| 100 250m2 | 10,067 | 3,959 | ₦14.1bn | ₦13.1bn | 25% | 4.4 yr |
| 50 100m2 | 9,819 | 2,962 | ₦2.6bn | ₦2.59bn | 25% | 4.4 yr |
| Under 30m2 | 8,525 | 2,377 | ₦313m | ₦312m | 7% | 14.6 yr |
| 30 50m2 | 5,801 | 1,664 | ₦578m | ₦558m | 11% | 8.9 yr |
| 250 1000m2 | 1,652 | 925 | ₦10.8bn | ₦10.4bn | 55% | 1.9 yr |
| Over 1000m2 | 18 | 12 | ₦669m | ₦658m | 65% | 1.4 yr |
Settlement type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Urban | 14,165 | 5,464 | ₦12.9bn | ₦12.6bn | 25% | 4.4 yr |
| Dense Urban | 10,775 | 3,714 | ₦5.79bn | ₦5.79bn | 25% | 4.4 yr |
| Unclassified | 5,837 | 1,105 | ₦4.55bn | ₦3.96bn | 13% | 6.9 yr |
| Rural | 5,105 | 1,616 | ₦5.8bn | ₦5.26bn | 25% | 4.4 yr |
Building type
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Residential Small | 14,443 | 4,585 | ₦3.92bn | ₦3.87bn | 25% | 4.4 yr |
| Shed | 10,275 | 2,252 | ₦236m | ₦236m | 7% | 14.1 yr |
| Residential | 8,548 | 3,287 | ₦20.2bn | ₦18.8bn | 25% | 4.4 yr |
| Residential Formal | 1,850 | 1,066 | ₦790m | ₦790m | 47% | 2.4 yr |
| Institutional | 259 | 247 | ₦1.19bn | ₦1.19bn | 57% | 1.9 yr |
| Educational Facility | 127 | 125 | ₦642m | ₦642m | 83% | 1.4 yr |
| Industrial Site | 89 | 82 | ₦505m | ₦505m | 71% | 1.4 yr |
| School | 67 | 67 | ₦223m | ₦223m | 83% | 1.4 yr |
| Healthcare Facility | 56 | 54 | ₦643m | ₦638m | 53% | 2.1 yr |
| Clinic | 44 | 42 | ₦297m | ₦244m | 53% | 2.1 yr |
| Agricultural | 33 | 14 | ₦10.1m | ₦10.1m | 29% | 3.9 yr |
| Market | 21 | 21 | ₦16.6m | ₦16.6m | 65% | 1.6 yr |
Land use
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| (Unset) | 35,882 | 11,899 | ₦29.1bn | ₦27.6bn |
Not published for this cube: Median IRR, Median payback.
Lead segment
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) | Median IRR | Median payback |
|---|---|---|---|---|---|---|
| Standard | 35,421 | 11,455 | ₦26.1bn | ₦24.7bn | 25% | 4.4 yr |
| Enterprise | 437 | 423 | ₦2.75bn | ₦2.69bn | 73% | 1.4 yr |
| SME High | 24 | 21 | ₦241m | ₦241m | 67% | 1.6 yr |
Demand tier
| Segment | Buildings | With generator | Spend ₦/yr | Cash saved yr 1 (B) |
|---|---|---|---|---|
| 2.0 | 11,966 | 4,110 | ₦5.8bn | ₦5.45bn |
| 0.0 | 10,306 | 2,265 | ₦246m | ₦246m |
| 3.0 | 9,534 | 3,742 | ₦21.3bn | ₦20.2bn |
| 1.0 | 2,699 | 981 | ₦592m | ₦591m |
| 4.0 | 1,375 | 799 | ₦1.11bn | ₦1.11bn |
| 5.0 | 2 | 2 | ₦41.4m | ₦41.4m |
Not published for this cube: Median IRR, Median payback.

